background image

SINGLE UNIT

Model PES-1

TWO UNITS WITH GATE

Model PES-DBL

97 Witmer Road

North Tonawanda, New York 14120-2421

Toll Free U.S. 866-396-2968 or 716-283-1826 / FAX 716-283-3249

www.conferladders.com

MADE IN THE U.S.A. by:

POOL ENTRY SYSTEM

ADJUSTS TO FIT 48” TO 54” POOLS AND DECKS

ASSEMBLY AND INSTALLATION MANUAL

SAVE THESE  INSTRUCTIONS 

DEALER/INSTALLER: GIVE TO HOMEOWNER

Содержание PES-1

Страница 1: ...onawanda New York 14120 2421 Toll Free U S 866 396 2968 or 716 283 1826 FAX 716 283 3249 www conferladders com MADE IN THE U S A by POOL ENTRY SYSTEM ADJUSTS TO FIT 48 TO 54 POOLS AND DECKS ASSEMBLY AND INSTALLATION MANUAL SAVE THESE INSTRUCTIONS DEALER INSTALLER GIVE TO HOMEOWNER ...

Страница 2: ... 1 3 1 4 20 X 1 Screw 1 3 10 x 1 1 4 Self Tapping Screw 1 2 Large Plug Side Panels 1 1 Label for Top Riser 1 2 Threaded Cap 1 2 Red Plug 1 1 Instructions 1 1 Registration Card 1 Tools Required For Assembly Mallet or Hammer Phillips Screwdriver Cordless Drill Motor 1 8 Drill Bit Level Hacksaw Knife Small Block of Wood Tape Measure Assembly Instructions CONFER PLASTICS INC POOL ENTRY SYSTEM FOR ABOV...

Страница 3: ...ning label to center of top riser The risers slip into grooves on steps FOR DECK ATTACHMENT MEASURE FROM HERE MEASURE FROM HERE FOR 2 UNITS ATTACHED GROUND LEVEL ENTRY TO ACCOUNT FOR THE POOL TOP SEAT ADD 1 2 TO MEASUREMENTS MEASUREMENT 1 MEASUREMENT 2 8 36 WRITE MEASUREMENTS MEASUREMENT 1 ______ MEASUREMENT 2 ______ 1 Measure the Depth of Your Pool A For Deck Level Pool Entry one 1 unit attached ...

Страница 4: ...re fastening the pool entry system to a deck Attach the deck connector to the top step using the three 3 1 4 20x1 screws and hex nuts nuts are installed on underside of deck connector 4 Step 8 On the bottom edge of each side panel is a drain hole Plug these holes by first inserting a Red plug into the hole and then covering with the threaded cap NOTE If you are fastening two units together do not ...

Страница 5: ... necessary to fill the outside unit with water Note Gate instructions and hardware are supplied with the gate Tilt the unit to allow the steps to fill with water When bubbling ceases steps are filled Steps must be filled completely to prevent floating Note Two people are required for this operation Position the PES with attached deck connector and drill three pilot holes Attach to deck using 3 10 ...

Страница 6: ...and the bottom drain caps and plugs can be removed With the unit on its side slowly pull the Entry System from the water allowing the water to drain out of the unit Once the unit is out of the pool be sure that all the water drains out If desired the unit can be disas sembled for winter storage Use a flat blade screwdriver to remove the locking wedges and carefully pull the side panels away from t...

Отзывы: