background image

Position the other end of the tread over
side panel [A]. Move the large flex riser [M]
in or out until it slips up into the groove 

located on the bottom of 
the large curved tread [O]. 
It will also be necessary 

to align the tabs on the 

tread support [N] with 
the two openings on 
the bottom of the large 

curved tread. 

Once everything 

is in position tap 

down on the large 
tread to lock onto 

panel [A].

Step 28

Install the first tread [I] onto the base
step by placing over the tabs on the side 

panels [A] as shown. 
While holding the 
tread down, tap 
inward with a 
rubber mallet until 
locked in place.

Step 29

Install the short
handrail post [K]
into the lower
opening on the
add-on panel [J]
marked with #3
next to it. Push
the tab on the
post all the way
in; then tap down
to lock in place.

Step 30

Place the medium curved tread [Q] over
the short handrail post and down on to

the tabs located on the add-on panel [J]. 
Move the riser in or 
out until it slips up 
into the groove on 
the bottom of the 
tread, using a 
rubber mallet strike 
the top of the tread 
until locked 
onto tabs.

Step 32

CONFER CURVE STEP ADD-ON INSTRUCTIONS (Cont’d.)

At this time add 30 lbs of sand through the
two fill holes located on the add-on panel.

Using a funnel fill the lower hole com-

pletely to the top with sand. Shake the panel 
to help settle 
the sand. Lower 
hole must be 
completely filled.

Pour whatʼs left 
from the 30 lbs, 
into the upper hole. 
Using provided cap, 
plug the lower fill 
hole only. Upper fill 
hole must remain open.   

Step 25

The next step will require an extra set of hands to help
align the large flex riser [M] and the tread support [N] into
the groove and the openings located on the bottom side of
the large curved tread [O].  

Step 26

Fill

Holes

It will be easier to start from
the add-on panel side and
work towards the base step.
Start by placing the large
curved tread in approximate
position over the panels and
flex riser. Next align the tabs
on the add-on panel with the
openings on the bottom side
of large curved tread. Lock
the tread down by striking
top of tread directly over the
tabs with rubber mallet.  

Step 27

Next, install the medium flex riser [P]
by sliding down into the slot located on

the add-on panel [J].  
Insert the tab located 
on the end of flex 
riser into the opening 
on side panel [A]. 
Riser will rest on 
the top back of 
tread below.

Step 31

6

prpd.Confer-CurveStepIGr16:Confer-Step-1_R1  1/3/13  2:26 PM  Page 6

Содержание CCX-IG

Страница 1: ... CURVE STEP IN GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL Made in the U S A by www conferladders com Model CCX IG Note 40 lbs of sand required Model CCX IG System Note 70 lbs of sand required SAND prpd Confer CurveStepIGr16 Confer Step 1_R1 1 3 13 2 26 PM Page 1 ...

Страница 2: ...te assembly The Curve Step with optional add on requires a total of 70 lbs of sand Choose a location close to the swimming pool for assembly Hardware Pack 2 Plugs WG 8 10 x 1 1 4 screws 2 Labels No Jumping Diving Hardware not provided to fasten step to concrete Purchase locally Needed for Assembly Rubber mallet Funnel Cordless Drill Phillips screwdriver Liquid soap or lubricant Sand 40 lbs for Cur...

Страница 3: ...nd part A Step 9 Step 7 Determine which side will be facing up on the front foot pads H 1 for a flat bottom pool or 2 for a pool with slight taper towards the center install both parts H The two back foot pads H will always be installed with 1 facing up Place part H over the rounded tab strike with a rubber mallet until seated onto the rounded tab Repeat to install second part H Step 8 SAND Pour s...

Страница 4: ...ws through the deck connectors and into the posts If you have a wood deck attach the deck connectors to the pool deck using 2 10 x 1 1 4 screws in each connector If your pool deck is concrete consult with your local hardware store for the proper anchors and screws With a helper place the pool step into swimming pool Hold the step under water at a slight angle until all the air bubbles stop Tilt th...

Страница 5: ...d H on to the bottom of the tread support N by placing over the raised tab and striking with a rubber mallet until seated Foot pad H should be installed in the same position as the front foot pads on base step Step 23 Locate the notch on the bottom edge of the large flex riser M Slide the step support N under then rotate up making sure part is in notch Step 24 5 S L K J R Q P M H N O Additional Pa...

Страница 6: ...UCTIONS Cont d At this time add 30 lbs of sand through the two fill holes located on the add on panel Using a funnel fill the lower hole com pletely to the top with sand Shake the panel to help settle the sand Lower hole must be completely filled Pour whatʼs left from the 30 lbs into the upper hole Using provided cap plug the lower fill hole only Upper fill hole must remain open Step 25 The next s...

Страница 7: ...st and attach the same as in step 32 Step 36 Install the lower and upper handrail posts E to the left side panel by repeating steps 12 and 13 Step 37 Repeat step 14 to install the top tread 1 3 Step 38 Place both deck con nectors F over the upper handrail posts and slide down Check to make sure the side marked this side down is facing downward Step 39 Place handrails G over the top of handrail pos...

Страница 8: ...e unit can be removed by both people standing on the deck and lifting and tilting the unit to drain some of the water from the steps After the unit is light enough carefully lift it from the pool CAUTION POOL STEP WILL BE HEAVY PLEASE HAVE ADDITIONAL HELP WHEN REMOVING FROM SWIMMING POOL DO NOT ATTEMPT TO REMOVE STEP BY YOURSELF The Confer Curve Step can be covered if desired and stored outdoors P...

Отзывы: