background image

2

Stand up both side
panels [A].  Insert
panel brace [B] into
opening located on
[A] then push down
to lock in place. 

Step 1

With the thin edge of
the curved riser [C]
facing downward
align the lower tabs
with the openings on
part [A] and push in.
Note risers must be
curved inward.

Step 2

While holding lower
tabs in part [A] align
the top tabs then tap
down with a rubber
mallet until flush.

Step 3

Install the rest of
the curved risers
[C] by flexing the
side panels [A] 
outward enough to
insert part [C] tabs
into part [A]. Tap
into place with 
rubber mallet.

Step 4

Confer Plastics “CURVE” In-Ground Pool Step

must be assembled with the treads and risers curved inward  

The CURVE Step requires 40 lbs. of sand to complete assembly. The Curve Step with optional add-on requires a
total of 70 lbs. of sand. Choose a location close to the swimming pool for assembly. 

Hardware Pack

2 - Plugs [WG]
8 - #10 x 1-1/4" screws
2 - Labels-No Jumping/Diving

Hardware not provided to
fasten step to concrete.
Purchase locally.

Needed for Assembly

- Rubber mallet
- Funnel
- Cordless Drill
- Phillips screwdriver
- Liquid soap or lubricant
- Sand - 40 lbs. for (Curve Step)

- 70 lbs. for (Curve System)

Model# CCX-IG

CURVE IN-GROUND POOL STEP 

ASSEMBLY INSTRUCTIONS - PLEASE READ BEFORE ATTEMPTING ASSEMBLY

Parts List

2 - Side panels [part A]
1 - Panel brace [part B]
3 - Curved risers [part C]
4 - Handrail posts [part E]
2 - Deck connectors [part F]
2 - Handrails [part G]
4 - Foot pads [part H]
2 - Treads [part I]
1 - Top tread [part I-3]

If missing parts call - Toll free U.S. - 800-635-3213 or www.Conferplastics.com

G

I

C

F

I-3

E

B

A

H

prpd.Confer-CurveStepIGr17_Confer-Step-1_R1  6/21/13  8:40 PM  Page 2

Содержание CCX-IG

Страница 1: ... CURVE STEP IN GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL Made in the U S A by www conferladders com Model CCX IG Note 40 lbs of sand required Model CCX IG System Note 70 lbs of sand required SAND prpd Confer CurveStepIGr16 Confer Step 1_R1 1 3 13 2 26 PM Page 1 ...

Страница 2: ...te assembly The Curve Step with optional add on requires a total of 70 lbs of sand Choose a location close to the swimming pool for assembly Hardware Pack 2 Plugs WG 8 10 x 1 1 4 screws 2 Labels No Jumping Diving Hardware not provided to fasten step to concrete Purchase locally Needed for Assembly Rubber mallet Funnel Cordless Drill Phillips screwdriver Liquid soap or lubricant Sand 40 lbs for Cur...

Страница 3: ...nd part A Step 9 Step 7 Determine which side will be facing up on the front foot pads H 1 for a flat bottom pool or 2 for a pool with slight taper towards the center install both parts H The two back foot pads H will always be installed with 1 facing up Place part H over the rounded tab strike with a rubber mallet until seated onto the rounded tab Repeat to install second part H Step 8 SAND Pour s...

Страница 4: ...ws through the deck connectors and into the posts If you have a wood deck attach the deck connectors to the pool deck using 2 10 x 1 1 4 screws in each connector If your pool deck is concrete consult with your local hardware store for the proper anchors and screws With a helper place the pool step into swimming pool Hold the step under water at a slight angle until all the air bubbles stop Tilt th...

Страница 5: ...d H on to the bottom of the tread support N by placing over the raised tab and striking with a rubber mallet until seated Foot pad H should be installed in the same position as the front foot pads on base step Step 23 Locate the notch on the bottom edge of the large flex riser M Slide the step support N under then rotate up making sure part is in notch Step 24 5 S L K J R Q P M H N O Additional Pa...

Страница 6: ...UCTIONS Cont d At this time add 30 lbs of sand through the two fill holes located on the add on panel Using a funnel fill the lower hole com pletely to the top with sand Shake the panel to help settle the sand Lower hole must be completely filled Pour whatʼs left from the 30 lbs into the upper hole Using provided cap plug the lower fill hole only Upper fill hole must remain open Step 25 The next s...

Страница 7: ...st and attach the same as in step 32 Step 36 Install the lower and upper handrail posts E to the left side panel by repeating steps 12 and 13 Step 37 Repeat step 14 to install the top tread 1 3 Step 38 Place both deck con nectors F over the upper handrail posts and slide down Check to make sure the side marked this side down is facing downward Step 39 Place handrails G over the top of handrail pos...

Страница 8: ...e unit can be removed by both people standing on the deck and lifting and tilting the unit to drain some of the water from the steps After the unit is light enough carefully lift it from the pool CAUTION POOL STEP WILL BE HEAVY PLEASE HAVE ADDITIONAL HELP WHEN REMOVING FROM SWIMMING POOL DO NOT ATTEMPT TO REMOVE STEP BY YOURSELF The Confer Curve Step can be covered if desired and stored outdoors P...

Отзывы: