2
Stand up both side
panels [A]. Insert
panel brace [B] into
opening located on
[A] then push down
to lock in place.
Step 1
With the thin edge of
the curved riser [C]
facing downward
align the lower tabs
with the openings on
part [A] and push in.
Note risers must be
curved inward.
Step 2
While holding lower
tabs in part [A] align
the top tabs then tap
down with a rubber
mallet until flush.
Step 3
Install the rest of
the curved risers
[C] by flexing the
side panels [A]
outward enough to
insert part [C] tabs
into part [A]. Tap
into place with
rubber mallet.
Step 4
Confer Plastics “CURVE” In-Ground Pool Step
must be assembled with the treads and risers curved inward
The CURVE Step requires 40 lbs. of sand to complete assembly. The Curve Step with optional add-on requires a
total of 70 lbs. of sand. Choose a location close to the swimming pool for assembly.
Hardware Pack
2 - Plugs [WG]
8 - #10 x 1-1/4" screws
2 - Labels-No Jumping/Diving
Hardware not provided to
fasten step to concrete.
Purchase locally.
Needed for Assembly
- Rubber mallet
- Funnel
- Cordless Drill
- Phillips screwdriver
- Liquid soap or lubricant
- Sand - 40 lbs. for (Curve Step)
- 70 lbs. for (Curve System)
Model# CCX-IG
-
CURVE IN-GROUND POOL STEP
ASSEMBLY INSTRUCTIONS - PLEASE READ BEFORE ATTEMPTING ASSEMBLY
Parts List
2 - Side panels [part A]
1 - Panel brace [part B]
3 - Curved risers [part C]
4 - Handrail posts [part E]
2 - Deck connectors [part F]
2 - Handrails [part G]
4 - Foot pads [part H]
2 - Treads [part I]
1 - Top tread [part I-3]
If missing parts call - Toll free U.S. - 800-635-3213 or www.Conferplastics.com
G
I
C
F
I-3
E
B
A
H
prpd.Confer-CurveStepIGr17_Confer-Step-1_R1 6/21/13 8:40 PM Page 2