EDGE router ER75i
•
one FME connector (ANT) – for connection of the antenna
•
one USB-B connector (USB) – for connection of the router to the
PC with Windows 2000, XP or VISTA operating system. For its
putting into operation it is sufficient to install drivers from the
supplied CD to the PC.
Modem status indication
On the front and back panel of the modem there are altogether
four LED indicators, which inform on the modem status.
Panel Colour
Description
Meaning
Front Green PWR
Blinking 1:9 ... join GPRS connection
Blinking 9:1 ... establishing of GPRS connection
Perm. on ....... starting of the ER75i
Front Red
GSM
Blinking …..... GSM/GPRS communication
Back Green –
On ................. selected 100 Mbit/s
Off ................. selected 10 Mbit/s
Back Green –
On.................. the network cable is connected
Blinking ......... data transmission
Off ................. the network cable is not connected
Putting into operation
Before putting the router into operation it is necessary to connect
all components needed for the operation of your applications.
The SIM card must be inserted (the modem is off) and connect its
to LAN or over crossover cable straight to
network socket
of computer.
The modem is put into operation by connection of the power
supply to the modem. In the default setting the modem starts to
login automatically to the preset APN.