3
Figure 2
Locate the word configuration at the top of the screen and click on it. Figure 3 should appear.
Страница 1: ...ION AND USER S GUIDE Carefully Read These Instructions Before Operating Carefully Read These Controls Corporation of America 1501 Harpers Road Virginia Beach VA 23454 Telephone 1 800 225 0473 or 757 4...
Страница 2: ......
Страница 3: ...ing a Parameter 15 EMAILING 18 EMAIL1 18 EMAIL2 20 EMAIL CONFIGURATION 23 Configuration Data 26 Warranty Information 27 Tables Table 1 STATUS screen functional descriptions 9 Table 2 EDIT screen funct...
Страница 4: ...rea network connection Power to the IntelliSwitch should be OFF Connect the IWS to the network via an RJ 45 network cable The RJ 45 connection on the IntelliSwitch is located on the bottom of the Inte...
Страница 5: ...2 Figure 1 In the orange column on the left locate the word Network and click on it The image in Figure 2 should appear...
Страница 6: ...3 Figure 2 Locate the word configuration at the top of the screen and click on it Figure 3 should appear...
Страница 7: ...4 Figure 3 Update the fields on the configuration with the desired network settings and click Submit Make sure you cycle power on the unit before attempting to connect using the new network settings...
Страница 8: ...me that is easily recognized for the device being used The IWS is now ready to use Refer to the section USING THE WEB SERVER to learn what functions it has and how to use it Figure 4 USING THE WEB SER...
Страница 9: ...so it can be used Green In Use indicates that the left side is being used Red Replace indicates that the gas supply on the left side needs to be replaced 2B Cylinder Selection Radio buttons indicate...
Страница 10: ...look back feature is invoked and after time out has determine that it can switch back to a side whose pressure has built back a switch back timer will start If the inlet pressure on the same side drop...
Страница 11: ...gulator U P value Delivery Regulator Status value Reserve Status value Alarm Clear U P Left Side value Alarm Clear O P Left Side value Alarm Clear U P Right Side value Alarm Clear O P Right Side value...
Страница 12: ...he Password pop up Figure 6 will appear Click in the blank text box and type 19490321 Now either click on OK or press ENTER on the keyboard The EDIT screen will appear Figure 7 Figure 6 Figure 7 The u...
Страница 13: ...start If the inlet pressure on the same side drops again before the switchback time has expired the IntelliSwitch determines that that side is truly empty and will alarm and switch to the other inlet...
Страница 14: ...n is selected asking the user to verify their intention to change the parameters 18 ZERO SET Button This button will zero the pressure displays It serves as a type of calibration feature If a pressure...
Страница 15: ...or the current entry until the user clicks the mouse on another parameter or in the open space on the screen The method for changing all text boxes is the same Use the pop up message as a guide to ent...
Страница 16: ...example it is initially set to HP or high pressure Figure 13 Using the Mouse click on the radio button that represents the selection to be made The radio button representing HP will change from green...
Страница 17: ...ut will not have been transferred to the IntelliSwitch More modifications can be made or all the changes can be voided and the original values restored to the screen by clicking on the UNDO button or...
Страница 18: ...U P under pressure Right Side U P value Reserve In Use Delivery Regulator O P value Delivery Regulator U P value Delivery Regulator Status value Alarm Clear U P Left Side value Alarm Clear O P Left S...
Страница 19: ...f the person or system sending the email 5 SET button Clicking this button will save the parameters that have been entered 6 TEST button This button allows the user to test the email function Clicking...
Страница 20: ...to report events An event is defined as any change that may occur to the IntelliSwitch Reported events include Inlet Value Status description Error description Left Side O P value O P over pressure Ri...
Страница 21: ...f the person or system sending the email 5 SET button Clicking this button will save the parameters that have been entered 6 TEST button This button allows the user to test the email function Clicking...
Страница 22: ...ondary DNS Servers Default Gateway Overriding Domain and Server Port may need to be identified and entered These values are set in the System Configuration screen which is accessed by clicking on the...
Страница 23: ...can be accessed It is only shown for reference and cannot be changed on this screen To change the IP address only if needed it is necessary to use the Device Installer software that was included in yo...
Страница 24: ...t number on that server Most services have a standard port 25 This port is used in conjunction with the Overriding Domain 7 SET button Clicking this button will save any new values entered into the sc...
Страница 25: ...ove the header footer sections of your web browser F11 toggles full screen ON and OFF Press again to return to normal screen Web server is not loading on the screen No power to the IntelliSwitch Ether...
Страница 26: ...___ Primary DNS Server ______________________________________ Secondary DNS Server ____________________________________ Default Gateway _________________________________________ Overriding Domain ____...
Страница 27: ...other than CONTROLS CORPORATION OF AMERICA or if the equipment has been subject to abuse misuse negligence or accident CONTROLS CORPORATION OF AMERICA s sole and exclusive obligation and Buyer s sole...
Страница 28: ...ADI 9513 D Certified ISO 9001 2000 Controls Corporation of America 1501 Harpers Road Virginia Beach VA 23454 Telephone 1 800 225 0473 or 757 422 8330 Fax 757 422 3125 www concoa com...