![Concept2 SENTINEL S55 v6 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/concept2/sentinel-s55-v6/sentinel-s55-v6_installation-and-operation-manual_2650733017.webp)
16
5.8 FLUID MANAGEMENT
The Smoke Screen has a replaceable 1 litre Swift-Fit fluid reservoir (also known as product code SFL-1000) that is
accessed by removing the cover on the right-hand side of the unit. The fluid level is monitored using sensors in
the fluid reservoir to give a “Low Fluid” indication output when the Swift-Fit is approximately 50% full and an
“Empty Fluid” output when the bottle is empty. The Smoke Screen will not produce fog when there is an “Empty
Fluid” indication.
Be aware of high voltage in
the Smoke Screen. The mains
electrical supply should be
switched off before changing
the fluid consumable.
If the generator has been in
service the heater block and
connected parts will be
extremely hot and will cause
injury if touched. Switch off
and allow the heater block to
cool.
Changing a fluid consumable
Obtain a replacement fluid reservoir from your Smoke Screen supplier. Open the right-hand access panel. Lift
the reservoir out of the compartment by removing the upper end first.
Disconnect the fluid monitoring cable
.
Disconnect the fluid feed pipe (pull collar to release).
Connect the monitoring cable and feed pipe to a new fluid
reservoir.
Insert the reservoir into the fluid compartment base first
ensuring that the pipe connection is not accidentally
released.
Make sure the notch in the reservoir is on the outside of the
Smoke Screen or the compartment door will not fit. This
orientation ensures that the fluid feed is correct for both
upright and face-down installations.
Содержание SENTINEL S55 v6
Страница 1: ...SENTINEL S55 v6 INSTALLATION AND OPERATION MANUAL Version November 2020...
Страница 13: ...12 Connections 4 4 1 CIRCUIT BOARD LAYOUT...
Страница 14: ...13 4 2 GENERIC CONNECTION DIAGRAM...
Страница 30: ...29 8 5 INSTALLER NOTES...