
Installation
I
3-3
3
Installa
tion
Installing the Non-Reversing Bulk Pump
Assembly
Mount pump on a level surface and make sure that the vibration damping pads, which are
shipped with the pump, are installed under the feet. This will help the pump from moving.
Run power wires from the starter output on the motor using appropriate wire sizes. Com-
pliance with NEC and/or local codes is the customer’s responsibility.
Connect the control wire of the pump’s 4-way valve solenoid to terminals 14 and 2 in the
control.
Connect a 60 to 100 psi compressed air source to the 4-way valve assembly.
Содержание VRU
Страница 4: ...ii I Table of Contents...
Страница 8: ...1 4 I Introduction...
Страница 14: ...3 4 I Installation...
Страница 15: ...4 S E C T I O N 4 O per a t ion Operation I 4 1 Operation Starting Operation 4 2 Stopping Operation 4 3...
Страница 17: ...Operation I 4 3 4 O per a t ion Stopping Operation 1 Turn power switch to OFF 2 Allow system to cool...
Страница 18: ...4 4 I Operation...
Страница 19: ...5 S E C T I O N 5 M aint enanc e Maintenance I 5 1 Maintenance Preventative Maintenance Schedule 5 2...