3-2
I
Installation
Unpacking the Boxes
Upon receiving the shipment, always perform a thorough inspection of the contents and
compare it the enclosed packing list. Make sure all parts listed are present and that no vis-
ible damage exists.
Inspect all of the equipment in the presence of the freight carrier’s representative for dam-
age during shipment. Note any damage on the delivery receipt before signing it. If damage
is evident, file a claim immediately against the carrier as it is their responsibility to pay for
any damage incurred during shipping. Make sure to include a detailed report of the dam-
age along with photos.
Control Installation
Mount control to a wall or other suitable structure where it will be free of vibration and
protected from weather and excessive heat. Operating temperature should not exceed
150°F {65.56°C}.
Run 3 phase electric line of appropriate voltage to disconnect, using wire sizes specified
by local electrical codes. (See wiring diagram for your model’s amperage rating.)
Содержание VRU
Страница 4: ...ii I Table of Contents...
Страница 8: ...1 4 I Introduction...
Страница 14: ...3 4 I Installation...
Страница 15: ...4 S E C T I O N 4 O per a t ion Operation I 4 1 Operation Starting Operation 4 2 Stopping Operation 4 3...
Страница 17: ...Operation I 4 3 4 O per a t ion Stopping Operation 1 Turn power switch to OFF 2 Allow system to cool...
Страница 18: ...4 4 I Operation...
Страница 19: ...5 S E C T I O N 5 M aint enanc e Maintenance I 5 1 Maintenance Preventative Maintenance Schedule 5 2...