2.Locating the footings for the playhouse structure
a.
Place the assembled platform next to the upright ladder.
b.
Line up the support plates of the assembled platform with
the inside rail of the vertical ladder. Make sure that the platform is
straight against the vertical ladder. Refer to fi gure 2a.
c.
At each corner, mark the ground for the footings, move the
platform out of the way and dig the holes. Refer to fi gure 2b.
Figure 2b
3.Playhouse Assembly
There are several different barrier confi guration possibilities.
These confi gurations are determined by the number of exits on
your set and the way that you want the structure assembled in
your yard. Please refer to the following lay out illustrations to
determine how to assemble the playhouse using the confi gura-
tion that you have purchased.
a.
Locate the four playhouse legs. Measure 45” from the end of the pipe to the center of the fi rst hole to determine which
end of the pipe is the top.
b.
Make a mark 4 ½” down from the top of each playhouse leg.
c.
Identify the layout illustration that shows the correct amount of exits included in your set.
d.
Lay the barriers out as shown in the illustration that represents your particular confi guration. Loosely install set screws
into each barrier sleeve.
e.
Pay particular attention to the position of each barrier in relation to the barrier at each side. The layout of the barriers
should follow an
over and under
pattern beginning with the entrance barrier. Please refer back to the layout illustration and
note the positioning pattern of the barriers.
Figure 2a
Optional Horizontal
Ladder
Toprail
Upright
Ladder
Содержание PH45
Страница 2: ......
Страница 3: ......
Страница 8: ...GROUND SPACE 18 X 32 RESIDENTIAL PLAY SPACE 22 X 41 Model PH45...
Страница 16: ......