into the holes.
10.
Install plugs into the ends of the Top Rails.
11.
Slide Top Rails into Top Sleeve of the Upright Ladders (see #2
Ladder to Top Rail assembly.) Secure set screws.
12.
Slide 3rd leg sleeve onto the top rail that is sleeved into the 10’
ladder.
13.
Measure 5 ½” - 6’ away from the 10’ Upright Ladder to mark and
dig the hole for the Third Leg (see #1B hole sizes for cementing).
14.
Before installing the third leg, locate the third leg. Insert ⅜” x 3 ½”
Hex Bolt and loosely thread ⅜” nut into the bottom hole. Nut will not
thread all the way on and the bolt will be loose. (This is to act as an
anchor in the concrete and does not need to be tight).
15.
Install Third Leg by dropping the end into the hole and sliding the
top into the 3rd leg sleeve. Use the ⅜” x 2 ¾” hex bolt and ⅜” nyloc
nut. Then secure 3rd leg with set screws in the top of the 3rd leg
sleeve.
16.
Assemble and attach Swing Hangers to Top Rail (see swing
hanger assembly sheet).
17.
Attach swing chains, seats, trapeze bar and rings.
18.
Measure the height of the Top Rails to ensure proper swing
height.
19.
Level the swing set.
20.
Mix concrete according to package directions and pour the
appropriate quantities into each hole.
21.
Allow cement to cure for 3-5 days and enjoy your Component
Playground!