1.c. Next have three adults stand on opposite ends and stand structure up into the holes that you have
dug.
#1
#2
#3
1.b. Assemble the 2 top rails to the post ends. Slide top rail into the sleeves on the post ends and
secure using 3/8” set screws provided. (4 set screws per end)