background image

 

Section 3 

Operation 

 

This section describes how to set up and make measurements with the HT-5000P ac/dc 

200mA unit. We recommend that you read the entire section carefully so that you can use all of 
its features.  

 

Setting up the HT-5000P ac/dc 200mA 

 

The  HT-5000P  ac/dc  200mA  is  shipped  in  a  special  protective  container  that  should 

prevent damage during shipping.  The container will include the following: 
 

 

The HT-5000P ac/dc 200mA Dielectric Withstand Tester 

 

A black 18 AWG Test Return Lead (Alligator Clip/Banana Plug ends) 

 

A red 18 AWG High Voltage Test Lead (Alligator Clip/High Voltage Plug ends) 

 

A Power Cord.  

 

This Instruction Manual 

 

18 AWG Line Power 

Cord

 

GL Return Test Lead 

Red 18 AWG High 

Voltage Test Lead  

 

 

 

 

 

Table 3-1. Shipment Cables & Connectors 

 

Use  the  original  shipping  container  for  subsequent  shipping.  If  the  original  shipping 

container is not available, be sure that adequate protection is provided to prevent damage during 
shipment. 

 

AC Line Voltage Requirements and Fuse Replacement 

 

Connect the HT-5000P ac 200mA only to the voltage source indicated on the rear panel. 

 

There is a user-replaceable fuse located on the front panel.  The fuse rating is printed on 

the  front  panel.    For  continued  protection  against  risk  of  fire,  replace  only  with  same  type  and 
rating of fuse. The AC Power switch should be turned off while the fuse is being replaced. 

 

Front and Rear Panel Features 

 

Before using the HT-5000P ac/dc 200mA tester, take a few minutes to become familiar 

with the use of its controls, indicators, and connectors.  The front panel features of the HT-5000P 
ac/dc 200mA are shown in Figure 3-1 and described in Table 3-2. 

 

Содержание HT-5000P

Страница 1: ......

Страница 2: ...i...

Страница 3: ...nd ergonomic front panel and represents the latest in high voltage laboratory testing To fully appreciate all the features of your new meter we suggest that you take a few moments to review this manua...

Страница 4: ...iii...

Страница 5: ...ory Testing 10 Factory Settings 10 Voltage Type Selection 10 Display of Leakage Limit and Duration Settings 10 Leakage Current Level Adjust 10 Voltage Adjust 11 High Voltage Test Time Adjust 11 Settin...

Страница 6: ...1...

Страница 7: ...ge current level pass fail requirement at this time for most equipment However higher than normal leakage current on a particular sample may indicate an assembly and or a component problem in the circ...

Страница 8: ...dicator lights a breakdown arc has been detected High Voltage Discharge The HT 5000P ac dc 200mA has an internal circuit designed to remove the high voltage after completion of the dielectric withstan...

Страница 9: ...eature most be disarmed by turning the voltage knob to the minimum also the unit must be armed by pressing the red RESET button The test will not begin until the blue TEST Button is pushed If a failur...

Страница 10: ...Panel Test Time Leakage Limit Voltage Adjustment Timer ON DEFEAT Hipot ON DEFEAT ENVIRONMENTAL Operating Temperature 15 40 C Relative Humidity Range 0 90 non condensing GENERAL Input power requiremen...

Страница 11: ...Table 3 1 Shipment Cables Connectors Use the original shipping container for subsequent shipping If the original shipping container is not available be sure that adequate protection is provided to pre...

Страница 12: ...7 Figure 3 1 Front Panel Controls Indicators and Connectors...

Страница 13: ...djust knob must be at the minimum position in order to disarm the Zero Voltage Start safety feature Item 15 7 VOLTAGE METER Connected to the output Reads actual output voltage Adjust meter range with...

Страница 14: ...current condition 12 Push the TEST button 13 Use the Voltage Adjust knob to increase the voltage output but the test should terminate immediately and the buzzer should sound The Excess Leakage Indica...

Страница 15: ...e Selection Use the AC DC Voltage Switch This switch is functional only when the RESET or TEST button is lit Display of Leakage Limit and Duration Settings To view the Test Duration and Leakage Limit...

Страница 16: ...nd Consult the safety agencies on the test time for the type of equipment being tested If a different test time is required use this procedure to set it 1 Connect the tester to a correctly rated sourc...

Страница 17: ...nt under test is grounded by the HT 5000P ac dc 200mA a risk of shock exists Testing Products This section describes how to conduct a test Testing can be terminated at any time by pressing the RESET b...

Страница 18: ...g as the TEST button is pressed 12 If no breakdown is detected the high voltage will be removed at the end of the test the Hipot Pass indicator will light and the RESET button will light 13 Do not dis...

Страница 19: ...failures ON DEFEAT Buzzer will turn sound It will not allow to test until the Test Timer switch is in defeat DEFEAT DEFEAT Test will continue only as long as the TEST button is held in minimum one se...

Страница 20: ...se is required for all in warranty repairs The manufacturer is also available for calibration and or repair of instruments that are beyond their warranty period Contact the manufacturer for a cost quo...

Страница 21: ...was entered the display will read Sure if not start over at step 1 6 While Sure is displayed on the screen you can 6 1 Press Reset to exit out of the Calibration Mode and keep all of the currently pro...

Страница 22: ...t 2 Select the type of output voltage with the AC DC Switch 3 Set up a 1000 1 probe with the volt meter has is shown on Figure 4 1 4 Enter to Calibration Mode See Entering Calibration Mode procedure 5...

Страница 23: ...firm the new voltage meter calibration performing again the Voltage Meter Verification procedure mentioned before Leakage Meter Verification 1 Turn Off the HT 5000P ac dc 200mA unit 2 Select the type...

Страница 24: ...the external current meter mA scale equals the number showed on the front meter of the HT 5000P ac dc 200mA unit then press the Test button and the front display will show hold for a few seconds wait...

Страница 25: ...ce West USA is available Phone 800 748 6224 Hours 8 30 AM 4 30 PM Pacific Time Also available on our web site at www compwest com Contact Compliance West USA 650 Gateway Center Way Suite D San Diego C...

Отзывы: