Compaq StorageWorks HSG60 Скачать руководство пользователя страница 7

Page 7

6. If enclosure power is applied, verify that the LED displays 

Charge Test state (see 

Figure 3

 for LED locations and 

Table 1

 for the proper display state).

7. Following ECB initialization, verify that the LEDs display 

either a Charging or Charged state (see 

Figure 3

 for LED 

locations and 

Table 1

 for the proper display state).

8. Press the release tab on the old ECB and pivot the lever 

downward.

9. Remove the old ECB from the enclosure.

10. Install the blank panel in the vacant ECB bay.

Updated StorageWorks Model 2100 and 
2200 Enclosure ECB LED Definitions

Table 1

 replaces Table 6–1 “ECB Status LED Displays” in the 

Compaq StorageWorks Model 2100 and 2200 Ultra SCSI 
Controller Enclosure User Guide
.

IMPORTANT:  

Make sure to identify the existence of this updated table in the 

user guide.

Table 1:  ECB Status LED Displays

LED Display

ECB State Definition

Startup: Checking temperature and 
voltage. If this state persists for more than 
10 seconds, then a temperature fault 
exists.
Backup: When power is removed, a low 
duty cycle F

LASH

 indicates normal 

operation.

Charging: The ECB is charging the 
battery.

Charged: The ECB battery is charged.

Charge Test: The ECB is ascertaining 
whether the battery is capable of holding 
a charge.

Temperature Fault Indications:

When this indication displays, the ECB 
battery charging is suspended until 
the temperature fault has been 
corrected.

When this indication displays, the ECB 
battery is still capable of backup.

ECB Fault: Indicates the ECB has 
faulted.

Battery Fault: The ECB determined the 
battery voltage is incorrect or the battery 
is missing.

LED Legend:
O

FF

F

LASHING

O

N

Содержание StorageWorks HSG60

Страница 1: ...tem For instructions on upgrading a single controller configuration to a dual redundant controller configuration refer to the appropriate array controller user guide or maintenance and service guide E...

Страница 2: ...2100 and 2200 enclosure ECB Figure 4 ECB and cache module locations in a StorageWorks Model 2100 and 2200 enclosure IMPORTANT When replacing an ECB see Figure 5 match the vacant ECB bay with the supp...

Страница 3: ...n a grounded antistatic mat HSZ70 Dual Redundant Controller Configurations Use the following steps and Figure 1 or Figure 2 to replace an ECB 1 Connect a PC or terminal to the maintenance port of the...

Страница 4: ...te to replace an ECB in single controller and dual redundant controller configurations using FRUTIL 1 Connect a PC or terminal to the maintenance port of the controller that has the defective ECB The...

Страница 5: ...if desired enter current data using the following command SET THIS_CONTROLLER TIME dd mmm yyyy hh mm ss IMPORTANT An internal clock monitors the life of the ECB battery This clock must be reset after...

Страница 6: ...ins to contact ground resulting in cache module damage NOTE If an empty bay is not available place the replacement ECB on top of the enclosure or at the bottom of the rack 6 Insert the replacement ECB...

Страница 7: ...de IMPORTANT Make sure to identify the existence of this updated table in the user guide Table 1 ECB Status LED Displays LED Display ECB State Definition Startup Checking temperature and voltage If th...

Отзывы: