HSZ70 Single-Controller Configurations

Use the following steps and 

Figure 1

 or 

Figure 2

 to replace an 

ECB:

1. Is the controller operating?

Yes. Connect a PC or terminal to the controller 
maintenance port supporting the old ECB cache 
module.

No. Go to 

step 3

.

2. Shut down “this controller” with the following command:

SHUTDOWN THIS_CONTROLLER

NOTE:  

After the controller shuts down, the reset button 

1

 and the first 

three port LEDs 

2

 turn O

N

 (see 

Figure 6

). This may take several 

minutes, depending on the amount of data that needs to be flushed 
from the cache module.
Proceed only after the reset button stops F

LASHING

 and remains O

N

.

Figure 6:  Controller reset button and first three port LEDs

3. Turn O

FF

 subsystem power.

NOTE:  

If an empty bay is not available, place the replacement ECB on 

top of the enclosure.

4. Insert the replacement ECB into an appropriate bay or near 

the ECB being removed.

CAUTION:  

The ECB Y-cable has a 12-volt and a 5-volt pin. 

Improper handling or misalignment when connecting or 
disconnecting could cause these pins to contact ground, resulting 
in cache module damage.

5. Connect the open end of the ECB Y-cable to the 

replacement ECB.

6. Turn O

N

 subsystem power.

The controller automatically restarts.

CAUTION:  

Do not disconnect the old ECB Y-cable until the 

replacement ECB is fully charged. If the replacement ECB status 
LED is:

O

N

, the ECB is fully charged.

F

LASHING

, the ECB is charging.

The subsystem can operate regardless of the old ECB status, but 

do not

 disconnect the old ECB until the replacement ECB is fully 

charged.

7. Once the replacement ECB status LED turns O

N

disconnect the ECB Y-cable from the old ECB.

8. Remove the old ECB and place the ECB in an antistatic bag 

or on a grounded antistatic mat.

HSZ70 Dual-Redundant Controller 
Configurations

Use the following steps and 

Figure 1

 or 

Figure 2

 to replace an 

ECB:

1. Connect a PC or terminal to the maintenance port of the 

controller that has the operational ECB.

The controller connected to the PC or terminal becomes 
“this controller”; the controller for the ECB being removed 
becomes the “other controller.”

2. Enter the following commands:

CLEAR CLI
SHOW THIS_CONTROLLER

Is this controller “configured for MULTIBUS_FAILOVER 
with...” mode?

Yes. Go to 

step 4

No. The controller is “configured for 
DUAL_REDUNDANCY with...” in transparent failover 
mode. Proceed to 

step 3

.

NOTE:  

Step 3

 is a procedural workaround for controllers in transparent 

failover mode to make sure that the battery test in field replacement 
utility (FRUTIL) executes properly.

3. Enter the following command:

RESTART OTHER_CONTROLLER

IMPORTANT:  

Wait until the following message is displayed before 

proceeding:
“[DATE] [TIME]-- Other controller restarted”

4. Disable failover and take the controllers out of 

dual-redundant configuration with one of the following 
commands:

SET NOFAILOVER

or

 

SET NOMULTIBUS_FAILOVER

5. Start the FRUTIL with the following command:

RUN FRUTIL

6. Enter 3 for the replace the “other controller” cache module 

battery option.

7. Enter Y(es) to confirm the intent to replace the ECB.

CAUTION:  

Do not disconnect the old ECB Y-cable until the 

replacement ECB is fully charged. If the replacement ECB status 
LED is:

O

N

, the ECB is fully charged.

F

LASHING

, the ECB is charging.

The subsystem can operate regardless of the old ECB status, but 
do not disconnect the old ECB until the replacement ECB is fully 
charged.
The ECB Y-cable has a 12-volt and a 5-volt pin. Improper handling 
or misalignment when connecting or disconnecting might cause 
these pins to contact ground, resulting in cache module damage.

1

Reset button

2

First three port LEDs

1

2

3

4

5

6

CXO6991A

2

1

Содержание StorageWorks HSG60

Страница 1: ...tem For instructions on upgrading a single controller configuration to a dual redundant controller configuration refer to the appropriate array controller user guide or maintenance and service guide E...

Страница 2: ...2100 and 2200 enclosure ECB Figure 4 ECB and cache module locations in a StorageWorks Model 2100 and 2200 enclosure IMPORTANT When replacing an ECB see Figure 5 match the vacant ECB bay with the supp...

Страница 3: ...n a grounded antistatic mat HSZ70 Dual Redundant Controller Configurations Use the following steps and Figure 1 or Figure 2 to replace an ECB 1 Connect a PC or terminal to the maintenance port of the...

Страница 4: ...te to replace an ECB in single controller and dual redundant controller configurations using FRUTIL 1 Connect a PC or terminal to the maintenance port of the controller that has the defective ECB The...

Страница 5: ...if desired enter current data using the following command SET THIS_CONTROLLER TIME dd mmm yyyy hh mm ss IMPORTANT An internal clock monitors the life of the ECB battery This clock must be reset after...

Страница 6: ...ins to contact ground resulting in cache module damage NOTE If an empty bay is not available place the replacement ECB on top of the enclosure or at the bottom of the rack 6 Insert the replacement ECB...

Страница 7: ...de IMPORTANT Make sure to identify the existence of this updated table in the user guide Table 1 ECB Status LED Displays LED Display ECB State Definition Startup Checking temperature and voltage If th...

Отзывы: