
2-28
Compaq ProLiant DL580 Server Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer:
Cynthia Dresden
Project:
Compaq ProLiant DL580 Server Setup and Installation Guide
Comments:
Part Number:
159213-003
File Name:
c-ch2 Installing Hardware Options.doc
Last Saved On:
4/9/01 5:07 PM
1.
Locate and remove the blanking panel bay by squeezing the right
retaining clip
and pulling the blank out of the drive bay
.
2
1
Figure 2-17. Removing a blanking panel
2.
Insert the hot-plug SCSI hard drive into the empty drive bay and push
until seated
.
3.
Push the drive lever in to lock the drive in place
.
2
1
Figure 2-18. Installing a hot-plug SCSI hard drive
4.
Place the hot-plug SCSI hard drive online as directed by your operating
system instructions. If the drive was replaced, the array controller does
an auto-spin up and starts rebuilding the drive.