6-7-06 - Fifth Proof
3-10
Pre-Start Inspection and Operation
Machine Shut-down
To safely shut the machine down, the operator must:
1. Park the machine on a solid, level area.
2. Lower the loader arm and attachment to the ground.
3. Idle the engine for 5 - 10 minutes to allow the machine to cool down.
4. Shut off the engine.
5. Clean off any accumulated mud and/or dirt from the machines operating surfaces, i.e.
operator's platform, drive wheels, etc.
Transportation
1. Move the throttle control lever to the mid-range engine speed and set the transport speed to
the LOW range. Raise the attachment so that it will clear the ramp of the transport trailer.
NOTE:
The longer the attachment, like the trencher, the more the attachment needs to either
be tilted or raised. It is recommended to back the machine onto the transport trailer and
position the machine so that the heaviest weight (center of balance) is towards the front
(hitch end) of the trailer. See Figure 3–10.
The Brute is designed for maximum working balance. When traveling on an incline,
always have the heaviest portion of the machine pointing uphill.
2. Follow general load carrying safety. Always carry the heaviest load pointing uphill.
NOTE:
When operating without an attachment, the operator becomes the load.
Figure 3–10 Transport Position on Trailer
3. When the machine is positioned on the trailer properly, lower the attachment to the trailer deck.
4. Shut the engine off and remove the key.
5. Secure the unit to the transport vehicle with DOT (Department of Transportation) approved
chains, binders, and DOT guidelines. Make sure to use the appropriate tie-down locations on
the machine and trailer.
CAUTION
2019
Содержание BOXER 427 Operators
Страница 2: ...6 7 06 Fifth Proof...
Страница 6: ...6 7 06 Fifth Proof iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Страница 8: ...6 7 06 Fifth Proof vi...
Страница 18: ...6 7 06 Fifth Proof 1 8 Safety Precautions...
Страница 31: ...6 7 06 Fifth Proof 3 5 Pre Start Inspection and Operation Figure 3 4 Lubrication Points 2128...
Страница 52: ...6 7 06 Fifth Proof 3 26 Pre Start Inspection and Operation...
Страница 74: ...6 7 06 Fifth Proof 4 22 Routine Service and Maintenance...
Страница 85: ...6 7 06 Fifth Proof...