![Compact Power BOXER 427 Operators Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/compact-power/boxer-427-operators/boxer-427-operators_operators-manual_2644627035.webp)
6-7-06 - Fifth Proof
3-9
Pre-Start Inspection and Operation
4. Rotate and hold the start switch (Item 1, Figure 3–9) in the START position until the engine
starts.
NOTE:
The low engine oil pressure warning horn will sound when the ignition key is turned
to the “ON” position. When the engine starts and oil pressure reaches normal, the horn will
shut off.
Figure 3–9 Engine Keyswitch
5. As soon as the engine starts, release the starter key. The key will automatically return to the
RUN position.
6. Slowly push the choke knob inwards. If the engine begins to sputter, pull the choke knob
outwards slightly until the engine smoothes out. As soon as the engine warms up and begins
to run rough, push the choke knob inwards to the normal operating position.
7. Leave the throttle setting at about the halfway position and allow the engine to idle. This will
begin warming the hydraulic oil.
NOTE:
In cold weather (32º F [0º C]) after about 5 minutes of engine idling, operate all of
the main hydraulic controls to cycle warmed hydraulic oil through the hydraulic lines into
the cylinders and hydraulic motors. Allow the engine to idle for another 5 minutes before
beginning any machine operations.
If the engine oil drops below the engine manufacturers required levels, a warning horn
will sound. Immediately shut down the engine to prevent severe damage.
DO NOT use the machine until repairs have been made.
1
2134
IMPORTANT
Содержание BOXER 427 Operators
Страница 2: ...6 7 06 Fifth Proof...
Страница 6: ...6 7 06 Fifth Proof iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Страница 8: ...6 7 06 Fifth Proof vi...
Страница 18: ...6 7 06 Fifth Proof 1 8 Safety Precautions...
Страница 31: ...6 7 06 Fifth Proof 3 5 Pre Start Inspection and Operation Figure 3 4 Lubrication Points 2128...
Страница 52: ...6 7 06 Fifth Proof 3 26 Pre Start Inspection and Operation...
Страница 74: ...6 7 06 Fifth Proof 4 22 Routine Service and Maintenance...
Страница 85: ...6 7 06 Fifth Proof...