5.
Pre
-install
ation
Pre-installation
Transit Damage
Once the unit is received on site, inspect the cabinet for the following:
▪
Shipping damage to cabinet, display or any other equipment.
▪
Water damage to components
Report any damage to the transport company and to the help desk. Take photographs if
required.
Tampering
Inspect for evidence of tampering with the unit especially card reader or unauthorised wiring.
Report any concerns to the help desk. Take photographs if required.
Vibration
Inspect terminals, plugs and IC chips to check they are securely in place and have not loosened
due to vibration.
Site Issues
Check that all wiring and pipework has been installed correctly and is undamaged. Report
issues to site manager.
Tools Required
It is expected that installers will carry a comprehensive tool kit including:
▪
Metric and imperial spanners
▪
Metric and imperial socket set
▪
Metric and imperial allen keys
▪
Torx and security torx keys
▪
Phillips, pozidriv and flat blade screwdrivers
▪
Electric impact drill with conventional and masonry drill bits
▪
Wire cutters
▪
Wire stripper
▪
Crimping tool
▪
EPROM extractor
▪
Multimeter
▪
Earthing wrist strap
▪
Laptop with fully charged battery and wireless modem
▪
LAN cable
▪
Fully charged cell phone
▪
Test cards and/or authorisation keys
The above list is a suggested minimum. It is recommended that you read the manual thoroughly
and include any other equipment that may assist you in completing the job safely and quickly.