3
3.2
Central core cable preparation
3.2.1 Prepare the cable according to the drawing. Strip the cable
over a length of 1000 mm (40”) for the 24 splice tray, 1300 mm (50”)
for the 48 splice tray and remove the central core up to 35 mm (1.5”)
from the cable cut.
4 Cable installation
4.1
All the fibers should be cleaned and free from cable grease or
dirt.
4.2
Remove the protection foil from the gel sealing blocks of the
closure.
4.4
Remove the cover of the splicing cassette.
A
Loose tube cable
4.5
Hold the cable in the correct position and slide the strength
member in the base part of the cable attachment bracket. The loose
tubes should protrude underneath the cable attachment bracket.
Note
: the tubes should be oriented in such a way that they are at the
bottom of the cable.
4.6
Secure the cable attachment bracket with a stainless steel cable
clamp to the cable.
4.3 Turn the top part of the outer strain relief clamps 90 degrees to
facilitate the cable fixing on the cable termination point.
25 (1.0”)
35-40 (1.5”)
1000-1300 (40”/50”)