![CommScope FIST-GCO2 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/commscope/fist-gco2/fist-gco2_installation-instruction_2643806003.webp)
3
5 Installing a cable in a tube
4.4
Position the heatshrink (multi-out) and tape the cable and tubes
together (in this way the heatshrink stays in position).
5.1
Cut off the top of the end cap and clean and abrade the tube
and cable.
5.2
Mount the multi-termination-plate and strength member
eyelet. Bring the cable through the heatshrink and port and fix the
strengthmember.
5.3
Clean and abrade the cable and end cap/alu pipe. Mark the
cable at 60 mm from the alu pipe end. Place the aluminium protection
foil, blue line matches the mark.
Note
: the aluminium protection foil is maximum 30 mm inside the heat
shrink.
4.5
Start shrinking from the top and continue downwards. Be sure
that the inside of the small ports are well heated.
Do not move the closure for about 20minutes and let the heatshrink
cool down.