![CommScope FIST-GCO2 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/commscope/fist-gco2/fist-gco2_installation-instruction_2643806002.webp)
2
Kit content can change depending the ordered kit.
• Heatshrink
• Multi termination plate
• Strength member fixation
• Aluminum foil
• Cleaning tissue
• Abrasive paper
• Installation instruction
3 Accessories
FIST-GCO2-RSK16-MC-U
Cable seal kit to seal the cable onto the alu pipe.
A strength member connector is included in this kit.
FIST-GCO2-RSK16-MC
Cable seal kit to seal the cable onto the alu tibe.
No strength member connector is included in this kit.
4 Installation
All dimensions needed for preparing cables can be found in the
standard installation instruction.
2 Kit content
4.2
Fix the strength member eyelet with the spacer screw. Bring the
cable through the heatshrink port (multi-out) and fix the strength member.
4.1
Open the round port,clean and abrade port,cable and tubes.
4.3
Bring the Tubes in the port.