Quick
Start
CommScope (logo) and CommScope are trademarks.
660002346 Rev C
© 2018, CommScope, Inc. All Rights Reserved.
26808-A
TC-96248-IP · Rev C · December 2018
FD Panel
Unpack the panel and check for shipment damage.
Report any damage to the carrier and also file a report at
www.commscope.com/SupportCenter
DEFAULT MOUNTING BRACKET POSITION
BACK OBLIQUE VIEW OF DEFAULT MOUNTING BRACKET POSITION
Remove the shipping brackets.
2
1
3
4
Mount panel to rack, and secure the
vertical cable guides using screws provided.
Select panel mounting option to be used.
Panel is shipped
with mounting brackets in position shown. If desired, brackets
can be removed and re-mounted in alternative position.
ALTERNATIVE MOUNTING BRAC KET POSITION
REMOVE
MOUNTING
SCREWS
(4 Places)
SHIPPING
BRACKET (2X)
CABLE
BRACKET (2X)
These instructions apply to both 1RU and
2RU panels.
NOTE:
5
Ground the panel using the
2-hole lug provided.
Adhere to local standards.
Remove brackets one
at a time.
NOTE:
NOTE:
Based on
rack type,
select from
screws
provided.
NOTE:
Secure
cable
bracket to
to the
lowest hole
of the
mountng
bracket.
NOTE:
1-hole lug
is also
provided.
Parts List
DESCRIPTION
FD PANEL
#12-24 X 1/2” SCREWS & LOCK WASHERS
QTY
1
44
M6 - 1 X 12mm SCREWS & LOCK WASHERS
4
VERTICAL CABLE GUIDES (VCGs)
2
PARTS LIST
ADDITIONAL SHORT VCGs
#12-24 X 3/4” SCREWS
2
2
M6 - 1 X 20mm SCREWS
2
VELCRO STRAP (LENGTH 4 FT.)
1
2-HOLE LUG, #6 WIRE
1
1-HOLE LUG, #14-6 WIRE
1
Required Tool
PHILLIPS #2 SCREWDRIVER