background image

Page 7 of 11

© 2018 CommScope, Inc. All Rights Reserved

7.9. 

When you route both trays, it should look as           

illustrated.

7.10.   Carefully close the back lid.

7.11.  

Close the bend control cover (retaining feature 

down).

7.12. 

Route the patch cords through the trumpet.

7.13.   Before closing the drawer, pay attention to the patch 

cord routing.

8. 

Installation of the Adapter 

Packs

8.1. 

FACT element is provided with 2 trays (2 apapter 

packs per tray) per drawer.

Содержание FACT NG4

Страница 1: ...the recommended bend radius limit when installing fiber optic cables and patch cords Exposure to laser radiation can seriously damage the retina of the eye Do not look into the ends of any optical fiber Do not assume the laser power is turned off or that the fiber is disconnected at the other end Pay attention to the routing of the patch cords These should move hang freely where they leave the ben...

Страница 2: ...e brackets on the position where you want to install the FACT chassis by sliding them in 5 1 2 Take the FACT chassis with both hands and align with the brackets on both sides 5 1 3 Slide the FACT chassis into the fingers until you hear a clicking noise 5 2 Dismounting FACT chassis 5 2 1 Open upper drawer releasable Note empty drawer is shown This one is marked at the front blue marking at the bend...

Страница 3: ...es 6 1 FACT element is provided with 2 trays 1 module per tray per drawer 6 2 To access the bottom tray remove the velcro and rotate the top tray to a 90 position 6 3 Use the latch to detach the insert on the desired side 6 4 Remove the insert 6 5 Align the module in on the side where the insert was removed by placing it on top 6 6 Align the module as illustrated Don t push it in yet 1 2 3 4 5 3 ...

Страница 4: ...Align the module as illustrated Don t push it in yet 6 8 Push in snapping feature number 1 6 9 Push in snapping feature number 2 6 10 Push in snapping feature number 3 6 11 Push in snapping feature number 4 6 12 Push in snapping feature number 5 4 1 2 3 4 5 4 ...

Страница 5: ...installed 6 15 LC MPO Module installed 6 16 Cabled Module installed 7 Routing the patch cords modules 7 1 Open the bend control cover Unlatch the snapping feature on the backside of the bend control as shown 7 2 The retaining feature can be opened hinged back if additional space is needed optional ...

Страница 6: ...h cords through the first bendµ as illustrated Use 6 patch cords per bend control for the VA Module Clean the connectors before installing 7 6 Route the patch cords through the first bend as illustrated Use 6 patch cords per bend control for the LC MPO Module Clean the connectors before installing 7 7 Route the patch cords through the first bend as illustrated Use 6 patch cords per bend control fo...

Страница 7: ... Carefully close the back lid 7 11 Close the bend control cover retaining feature down 7 12 Route the patch cords through the trumpet 7 13 Before closing the drawer pay attention to the patch cord routing 8 Installation of the Adapter Packs 8 1 FACT element is provided with 2 trays 2 apapter packs per tray per drawer ...

Страница 8: ...cro and rotate the top tray to a 90 position 8 3 Align the Adapter Packs 8 4 Make sure that features 1 2 3 are aligned correct 8 5 Align feature number 1 and push it in flush with edge 8 6 Align snapping feature number 2 and push it in 8 7 Align snapping feature number 3 and push it in 3 1 2 3 1 2 ...

Страница 9: ...acks installed 9 Routing of the patch cords Adapter Packs 9 1 Open the bend control cover Unlatch the snapping feature on the backside of the bend control as shown 9 2 The retaining feature can be opened hinged back if additional space is needed optional 9 3 Open the back lid by pushing the snap feature to the inside and then lifting the lid ...

Страница 10: ...the first bend as illutrated Use 6 patch cords per bend control for the LC LC Adapter Packs Clean the connectors before installing 9 6 Route the patch cords through the first bend as illustrated Use 2 patch cords per bend control for the MPO MPO Adapter Packs Clean the connectors before installing 9 7 Route the patch cords to the back side of the FACT element 9 8 When you route both trays it shoul...

Страница 11: ...ted to the highest standards of business integrity and environmental sustainability with a number of CommScope s facilities across the globe certified in accordance with international standards including ISO 9001 TL 9000 and ISO 14001 Further information regarding CommScope s commitment can be found at www commscope com About Us Corporate Responsibility and Sustainability 11 Contact information Vi...

Отзывы: