CommScope COWO Скачать руководство пользователя страница 7

7

D   

Cable management pre-assembled cable (drop cable) 

5.5  

Up to 2 SC-Adapter or 1 LC-Adapter can be positioned at the 

front face or inside the box. 

5.6  

Bottom drop cable entry.

6   

Strain relief for Aramid-Fibers

 

A   

Strain relief first cable (75 mm)

5.7  

Rear drop cable entry.

6.1  

Cut the Aramid-Fibers to length as shown above. Put the 

Aramid-Fibers through the slot of the strain relief as shown and push the 
fibers on both sides of the strain relief down. Ensure that all fibers are 
underneath the slot. The length of Aramid-Fibers on the left and right 
hand side of the strain relief should be about the same. Then turn the 
strain relief clockwise using a cross-head screwdriver until the Aramid-
Fibers are under tension and properly wound up. 

Strain relief 
first cable

Содержание COWO

Страница 1: ...d with a screw or wire seal COWO I N S T A L L A T I O N I N S T R U C T I O N Customer Wall Outlet 2 Kit content 3 Handling of the box 2 X Screw ISO 7049 ST3 5x30 C H A2 2 x Wall Plug D5 25 1x Instal...

Страница 2: ...its receptacle in the cassette see above Cable guide for second cable Position the cable guide according to the intended cable entry and push the cable guide into place by aligning the 2 domes with th...

Страница 3: ...able 3 4 3 Open up the cable entry if 2 cables will be cable 3 7 mm 3 4 4 Open up the cable entries in vase and cable guide if cable diameters 5mm 3 4 5 Remove the small rib in the base if required in...

Страница 4: ...cal Tighten the screws 3 6 Remove all burrs and sharp edges from the cable entries and adapter port with a sharp knife e g carpet cutter 4 3 Vertical wall mounting holes 1 Horizontal wall mounting hol...

Страница 5: ...wn aligning the end of the cable sheath with the cable stop at the bottom of the box The fibers coming from the bottom entry of the box are routed to the splice cassette through a channel as shown Gui...

Страница 6: ...splicing is done Secure the cable using the strain relief 5 4 Observe the minimum bend radius for the cable when it is outside the wall box Excess length should wound up behind the box in a loop For...

Страница 7: ...Aramid Fibers to length as shown above Put the Aramid Fibers through the slot of the strain relief as shown and push the fibers on both sides of the strain relief down Ensure that all fibers are under...

Страница 8: ...le entry 125mm 6 2 In case of strain relief second cable repeat the steps from point 6 1 6 4 In case of strain relief top cable entry repeat the steps from point 7 1 v 5 3 In case of strain relief bac...

Страница 9: ...ength of the fibers coming from the left side of the base 1 2 m is guided to the right side of the cassette and wound up in here in a clockwise direction The ends of the fibers are guided to the splic...

Страница 10: ...10...

Страница 11: ...11...

Страница 12: ...specifications or warranties relating to CommScope products or services This product is covered by one or more U S patents or their foreign equivalents For patents see www commscope com ProductPatent...

Отзывы: