Instruction Sheet 

 

www.commscope.com 

 

Page 12 of 13 

Securing the Cable 

To secure the incoming fiber optic cable to the back of the shelf and rack: 
1.  Insert a cable tie retainer (provided) up through the hole in the cable support on the rear of the shelf on the 

side opposite from where the cable enters the shelf (Figure 13). For example, if the cable enters the shelf on 

the right side, use the hole on the left side of the cable support. 

Note:

  Two cable tie retainers are provided for your convenience. 

2.  Insert a cable tie (provided) through the cable tie retainer and secure the incoming fiber optic cable to the 

cable support. 

Important

:  Do not tighten the cable tie completely. For a sliding shelf, leave enough slack so that the cable 

moves freely when you slide the shelf out from the rack. 

3.  Secure the incoming fiber optic cable to the back of the rack approximately 7 inches (about 18cm) above the 

shelf (Figure 13). 

4.  If the shelf is a sliding shelf, slide the shelf out of the rack and back in, making sure that it slides freely and 

the panel bus jumper does not bind. 

Note

:  The ribbon cable of the panel bus jumper may slide in the corrugated tubing. 

Checking the Panel Bus Jumper 

1.  Make sure that the panel bus jumper is still firmly connected to the faceplate (Figure 13). 

Important

:  The connector is keyed. The polarized tab on the panel connector fits into the opening in the 

header connector on the back of the faceplate. 

 

Figure 13  Securing the Cable and Checking the Panel Bus Jumper 

 

 

 

Panel bus

jumper

Cable tie through

cable tie retainer

Cable tie

Fiber

optic cable

Содержание 760193789

Страница 1: ...must be Version 7 1 or later We recommend that you upgrade the System Manager software to Version 7 1 or a later version before you install the shelf Ordering information is listed below Material ID Part No Description 760193789 360 iP G2 1U LC FX iPatch G2 LC fiber shelf fixed 760193797 360 iP G2 1U LC SD iPatch G2 LC fiber shelf sliding SYSTIMAX 360 iPatch G2 Fiber Shelf How to Contact Us To fin...

Страница 2: ...r fixed fiber tray LC duplex fiber faceplate 24 ports iPatch Ready LC fiber module plastic cover 1 Panel bus jumper 2 mounting brackets 2 3 inch storage drums 1 Patch cord trough 1 Hinged door for patch cord trough 4 12 24 x 1 2 inch screws for mounting the shelf in a 19 inch or 23 inch 584mm rack 2 Liquid tight cable fittings with lock nuts 2 Plastic cable tie retainers 6 Fiber type labels 4 labe...

Страница 3: ...onized fiber optic cable which has a preferential bend axis Use caution to avoid kinking trunk cables iPatch high density fiber MPO adapters are equipped with protective dust caps installed in the front of all adapters Prior to installation clean the trunk cable and jumper connectors per the manufacturer s recommendations All wiring that connects to this equipment must meet applicable local and na...

Страница 4: ...etainer on the outside of the rail as shown in Figure 2 Position the corrugated tubing so that about 1 inch 2 5cm of the tubing extends past the end of the cable retainer 5 Position the exposed ribbon cable of the panel bus jumper in the flat retainers on the outside of the sliding rail as shown in Figure 2 Figure 2 Routing the Panel Bus Jumper for a Sliding Shelf For a fixed shelf 1 Slide the pla...

Страница 5: ... x 3 8 inch screws included in the kit Mount the shelf to the rack using the four 12 24 screws provided For an ETSI rack use the 600 23BRKT accessory kit ordered separately and install one conversion bracket on one side of the shelf using two of the four 10 32 screws included in the kit Mount the shelf to the rack using four M6 x 12mm screws The shelf will not be centered in the rack Figure 4 Inst...

Страница 6: ...trough to secure it to shelf Note If installing the trough on a sliding shelf pull the shelf out enough to support the faceplate from behind before tightening the captive screws Note Shelf shown is representative actual shelf may vary Figure 6 Installing the Trough on the Shelf Step 5 Installing the Cable Directions are provided in the sub sections below for preparing the fiber optic cable and con...

Страница 7: ...he plastic plug from an appropriate cable entry hole in the back of the shelf 5 Feed the buffered fibers and the jacketed end of the cable through a round hole in the back of the shelf Figure 8 6 Unscrew the liquid tight lock nut and feed it through the selected cable entry hole to the inside of the shelf 7 Hold the liquid tight cable fitting so that the threaded portion is through the hole in the...

Страница 8: ...ing V groove on the opposite side of the base Wearing safety glasses hold the base with a pair of pliers and grasp the breakaway tabs with another pair of pliers just above the V groove Figure 9 Bend the tab back and forth several times until it breaks off Repeat this process to remove the breakaway tabs on the opposite side of the base Use a file or sandpaper to smooth any rough edges that result...

Страница 9: ...lices you are making splice the incoming buffered fibers to the pigtail 3 For fusion splices use your fingers to place the splices in the splice trays ordered separately in the recommended sequence shown in Figure 10 Note The numbers shown in Figure 10 do not appear on the actual splice trays For rotary mechanical splices use a 1012A compression tool to compress the springs on the splices and plac...

Страница 10: ...htly to allow the rear latch to engage the splice tray 3 Push down on the splice tray at the rear latch until the splice tray snaps into position fully engaging the rear latch 4 Install the pivoting tray in the RoloSplice base 5 Dress the fibers as shown in Figure 11 and route the slack around the storage drums 6 Connect the pigtail connectors to the adapters on the back of the faceplate Figure 11...

Страница 11: ...able 1 Install LC connectors on the buffered fibers 2 Route the buffered fibers around the storage drums to the adapters on the back of the faceplate Figure 12 3 Connect the terminated fibers to the adapters on the back of the faceplate Figure 12 Routing the Terminated Fibers Faceplate Terminated fibers ...

Страница 12: ... a sliding shelf leave enough slack so that the cable moves freely when you slide the shelf out from the rack 3 Secure the incoming fiber optic cable to the back of the rack approximately 7 inches about 18cm above the shelf Figure 13 4 If the shelf is a sliding shelf slide the shelf out of the rack and back in making sure that it slides freely and the panel bus jumper does not bind Note The ribbon...

Страница 13: ...ing one hand to support bottom of trough on one end push down on inside of door over hinge pins with other hand to seat pins into hinge sockets 5 Repeat on other end to secure door to trough 6 Pivot door into the vertical position until strikes engage latches and door snaps into the closed position with an audible click 7 Door may be reopened by pulling on both upper corners of door opposite strik...

Отзывы: