4
T-Bar Installation
CAUTION: The weight of the Edge Lit Panel is not de-
signed to be supported by the ceiling grid. It must be
tied back to the structure. Failure to do so can cause
serious injury.
NOTE:
• Building supply wires must be min 90°C.
• Fixture wiring compartment rated for 2in/2out
#12AWG only.
CC
GROUND WIRE
BUILDING POWER SUPPLY
BUILDING COMMON
EE
GG
WIRE
1
Connecting the Conduit Connector
3
Connecting the Wiring
2
Securing the Edge Lit Panel
□
Feed building supply wires through the wiring
cover (GG) and attach to the conduit connector (by
others) and incoming flexible conduit (by others).
□
Using the Live Quick Connect Jumper (EE) supplied
in the hardware kit:
□
Remove flat wiring cover from the back of the
Edge Lit Panel. Do not discard the screw.
□
On the back of the fixture, bend the mounting tabs
upward using a small screwdriver as shown.
□
Place the Edge Lit Panel in desired location and
secure to the building structure using wire.
□
Connect the black wire to the building power supply wire.
□
Connect the white wire to the building common wire.
□
Snap the Live Quick Connect from the panel to the jumper.
□
Connect the green/yellow ground wire that is attached to
the back of the panel to the building ground wire.
□
Place all wiring connections into the panel wiring compartment.
□
Attach the wiring cover (GG) to the back of the panel.
□
Cut ceiling tiles to fit as necessary.
GG