![Commercial Electric 1005 228 888 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/commercial-electric/1005-228-888/1005-228-888_use-and-care-manual_2643171004.webp)
4
Installation
1
Identifying the Wires
□
Turn OFF the main power at the circuit breaker
before installing the fixture.
□
Identify the wiring: (black - line voltage, white - neutral
and green - ground)
2
Attaching the Mounting Plate
□
Attach the mounting plate (AA) to the junction box
using the two #8-32 x 1 in. screws (DD).
□
Align the mounting plate in the direction you want
the fixture to be aligned. Once the toggle bolts are
installed, you cannot change the orientation.
3
Positioning the Toggle Bolts
4
Securing the Toggle Bolts
5
Re-attaching the Mounting Plate
6
Connecting the Fixture
□
Using the mounting plate (AA) as a guide, mark the
position of the holes on the ceiling or wall where the
toggle bolts will be placed.
□
Remove the mounting plate (AA) from the junction box.
□
Hook the support wire from the fixture on the
mounting bracket plate.
□
Drill the marked locations using a 1/2 in. drill bit.
□
Remove the wings from the 3/16 in. toggle bolts (BB).
□
Insert a screw (BB) through the front of the mounting
plate (AA) and reattach the wing to the screw (BB).
Repeat for all toggle bolts.
CAUTION: Care must be taken not to have excess wires
outside the junction box to avoid pinching wires. This
may cause a short and could lead to a potential hazard.
□
Feed the junction box wires through the center of
the mounting plate (AA) hole.
□
Re-attach the mounting plate (AA) by inserting the
toggle bolts (BB) into the drilled holes.
□
Once the wings (BB) are through and expanded,
pull the toggle bolts (BB) downward to engage and
tighten.
1
2
AA
BB
Line voltage
BB
Ground
Neutral
AA
AA
DD
AA