4.3 Chassis Ground
CAUTION
DO NOT ENERGIZE THE PANEL bEFORE
CHASSIS GROUND IS CONNECTED.
WARNING
DO NOT USE HARDWARE WITH A LENGTH EXCEEDING
3/4 INCH FOR CHASSIS GROUND CONNECTIONS.
The chassis ground is located on both sides of the panel. Two-hole lug landing
positions are provided. See table below for termination information. A minimum of #4
AWG chassis ground cable is required.
TAbLE 2. CHASSIS GROUND TERMINATION SPECIFICATIONS
TERMINATION
TYPE
HOLE/STUD
SIZE
CENTER TO CENTER
RECOMMENDED TORQUE
VALUE
Threaded Insert
1/4 in.
5/8 in.
75 in∙lbs
Step 1.
Secure the ground cable to the chassis by tightening 1/4 in. hardware
(see
Figure 7)
.
4.4 Input Connections
WARNING
y
INPUTS MUST bE PROTECTED bY A LISTED CIRCUIT bREAKER
OR bRANCH RATED FUSE. THE CIRCUIT bREAKER OR FUSE
MUST bE RATED AT 125% OF THE PANEL RATING.
NOTICE
y
MAKE SURE THAT ALL FEEDER CAbLES HAVE HEAT SHRINK APPLIED
PRIOR TO TERMINATION, AND THAT NO-OXIDE COMPOUND
IS APPLIED TO ALL COPPER-TO-COPPER CONNECTIONS.
y
SEE APPENDIX b ON PAGE 17 FOR COMPRESSION LUG
SPECIFICATIONS, TOOLING, AND ORDERING INFORMATION.
TAbLE 3. INPUT TERMINATION SPECIFICATIONS
TERMINATION
TYPE
HOLE/STUD
SIZE
CENTER TO CENTER
RECOMMENDED TORQUE
VALUE
Threaded Stud
1/4 in.
5/8 in.
75 in∙lbs
Step 1.
Secure the RTN input cables/lugs to the RTN input studs located on the rear of
the panel
(see Figure 8)
. Ensure that all hardware is tightened.
Step 2.
Secure the HOT input cables/lugs to the HOT input studs located on the rear of
the panel
(see Figure 9)
. Ensure that all hardware is tightened.
4.5 Safety Covers
Figure 7. Chassis Ground Landing
Figure 8. RTN Input Landing
Figure 9. HOT Input Landing
Содержание TPA 250 Fuse Panel Series
Страница 1: ...SETUP AND OPERATION MANUAL F O R T E L E C O M B R O A D B A N D TPA 250 Fuse Panel...
Страница 3: ...SETUP AND OPERATION MANUAL F O R T E L E C O M B R O A D B A N D TPA 250 Fuse Panel...
Страница 6: ...TPA 250 FUSE PANEL SETUP AND OPERATION MANUAL PAGE vi THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...TPA 250 FUSE PANEL SETUP AND OPERATION MANUAL PAGE 8 Installation THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...TPA 250 FUSE PANEL SETUP AND OPERATION MANUAL PAGE 10 Operation THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 27: ...THIS PAGE INTENTIONALLY LEFT BLANK...