Installation
900475-00, 08/2015
Innovative Hearth Products
Aurora™ 35/40/45 Direct-Vent Gas Fireplaces
32
Typical
Termination
Shown
7”
(178)
5-1/8”
(130 mm)
12-1/8”
(308 mm)
Note: Centerline of Vent Piping is
NOT the Same as the Centerline of
the Frame Opening.
6” to 48” Vent Section,
Telescopic vent section,
Elbow or Appliance Collar
Base of Appliance
3”
(76 mm)
1”
(25 mm)
Adaptor
SV4.5RCH
10-1/2”
(267 mm)
See
Table 11
for the minimum distance to
the base of the fireplace.
To help minimize water infiltration it
is recommended that the Firestop/
Spacer (SV4.5HF) be installed on
the exterior side of the wall.
* Use silicone caulking to seal the
top and sides of the termination,
up to the underlayment, stucco,
or masonry wall surface.
Venting Connection and Exterior wall Recessing of the
Horizontal Square Termination (SV4.5HT-2).
Adaptor
SV4.5RCH
**For thicknesses greater than
9-1/4” (235 mm), see
Table 21
.
SV4.5HT-2
Square Termination
Maximum wall Thickness
9-1/4” (235 mm)**
Exterior Surface of Siding
Exterior Surface of
Framing
6” to 9-1/4”
(152 to 235 mm)**
1-1/4” Maximum Recess of
the Square Termination into
Exterior Finishing Material
SV4.5HT-2
Square Termination
Caulk*
Caulk*
Stucco
Siding
Interior Surface of
Finished Wall
Last Vent Section. Use
Telescopic Vent Section
(SV4.5LA), If Necessary
Maximum Extent of Vent
Run Sections Relative
to Exterior Surface of
Framing
Figure 26 - Installing the Horizontal Termination
Figure 27 - Venting Connection and Exterior Wall Recessing of the Horizontal Termination H1968
*
*Recommended IHP termination kit: H1968.
**With termination kit only, 6 to 9-1/4”