2
ON: the link through the port is successfully established at
10/100Mbit/s.
Blink: the switch is sending or receiving data.
PoE
Orange
OFF: no PoE (PD) connected.
ON: PD successfully connected to the port.
Blink: abnormal PoE supply.
Rear panel
The rear panel have the terminals to connect the DC power input (standard redundant power backup 5 pinhole
terminals).
Power input
In the rear panel there are 5 industrial power input terminals (48-57VDC) labeled V1-, V1+ (PWR1), V2- and V2+
(PWR2), 2 DC power inputs with redundant functions. They can be used alone or can be connected to two independent
DC power supply at the same time to avoid a power system failure and improves the network's reliability.
: connect to the ground to prevent lightning strike.
Installation
This part describes how to install the switch and make the connections. Please follow the instructions to avoid damages
and security problems.
Before cleaning the switch, unplug the power supply. Do not clean the switch with wet cloth or liquid
Do not place the switch near water or any damp area. Prevent water or moisture from entering into the chassis
Do not place the switch on an unstable place or desk. The switch might be damaged severely in case of fall
Ensure proper ventilation of the equipment and keep the ventilation vents free of obstructions
Make sure that the operating voltage is correct
Do not open the chassis while the switch is powered to avoid electrical shocks.
DIN-rail installation
Use the 45mm standard DIN rail type. This product has supplied installation fittings.