IMI 66-047
Maintenance
Station Self Test
----
The multiline stations can be self tested for proper operation per the
following instructions.
1.
Disconnect the line cord at the station base.
IMPORTANT NOTE
THE ADJACENT ODD OK EVEN STATION WILL BE DISABLED DURING THE
TIME THAT THE STATION LINE CORD IS BEING DISCONNECTED OR
RECONNECTED.
2 .
Press and hold the
MUTE
and reconnect the line cord to the
station connector.
The station will automatically perform a Self
test routine.
Release the
MUTE
key as soon as the test begins.
The sequence of the test is as follows:
3 AND LINE
SEQUENCE
INDICATION
1
B-Field
light in turn and stay on
2
ITCM indicator lights
3
MONITOR indicator lights
4
All indicators extinguish in same order as lighted
5
Ringer sounds (be sure volume is set to med. or high)
22 LINE/FEATURE
SEQUENCE
INDICATION
1
MONITOR indicator lights
2
B-Field indicators light in turn and stay on
3
HOLD indicator lights
4
ITCM indicator lights
5
A-Field indicators light in turn and stay on
6
All indicators extinguish
7
Ringer sounds (be sure volume is set to med. or high)
3 .
Replace any station that does not pass the self test.
Test the DSS/BLF Console for proper lamp operation per the following
procedure.
1.
Disconnect the console line cord plug from the line.
Press and hold console key
while reconnecting the line cord
plug to the line.
4-3
Содержание Executech 2232
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 25: ... IMI 66 047 Installation L Figure 2 4a System Interconnection Typical Connections 2 15a ...
Страница 26: ...IN1 66 047 Installation 2 Figure 2 4b System Interconnection Typical Connections 2 15b ...
Страница 27: ...IMI 66 047 Installation 2 16 ...
Страница 28: ......
Страница 61: ......
Страница 71: ......
Страница 75: ......
Страница 79: ...COMDIAL Charlottesville Va 22901 PRINTED IN U S A 716604 700 01 ...
Страница 80: ......