2.8
Attach shoulder belts to the shoulder belt hook of the left and right insert plastics.
Pull out the crotch belt and put the insert plastics into the buckle until a “Click”
sound is heard.
Tightening-As figure Pull out the crotch belt belt the inside a layer PP belt for pull to
the end, is the shortest state.
Extending-As figure According to the direction of arrow pull out the crotch belt
to end PP belt the end, then as figure Direction of arrow pull to the end.
Pull the crotch belt end pull the shoulder belts and waist belts to check if it is secured.
Upright Recling
reclining
Install and adjust the crotch belt (Figure 2.7)
When unstalling the canopy, press the joint claw of canopy roof and pull out from the stand
of canopy.
Fold the canopy.
Fully insert the canopy joint into the canopy stand.
Elect the backrest and fix the canopy buckle (1 place).
Folding
Содержание Umbretta 4CAS
Страница 1: ...Instruction manual Umbretta 4CAS...
Страница 2: ...Umbretta 4CAS 19 28...
Страница 3: ...9 10 11 12 13 14 15 16 18 19 20 21 31 22 37 36 6 38 39 40 34 17...
Страница 4: ...1 3 1 4 1 5 1 6...
Страница 5: ...2 8 2 7...
Страница 6: ......
Страница 7: ...10...
Страница 8: ......
Страница 9: ...c b a...
Страница 16: ...S Footmuff cover...
Страница 22: ...15kg 10kg 15kg...
Страница 23: ...ASTM ASTM 150 6...
Страница 24: ......
Страница 25: ...2 1...
Страница 26: ...S ASTM ASTM...
Страница 27: ...1 7 2 2 2 4 2 7 3 5 3 1 2 2 2 3 2 5 2 6...
Страница 28: ...2 8 1 2 U 2 U U 2 25...
Страница 29: ...ASTM ASTM ASTM 26...
Страница 31: ...116376050...