INSTALLATION GUIDE FOR RX-4122
ENU STATUS : 1-0-1
Copyright - refer to title page
Page 48
6 MAINTENANCE
The PS BDA is designed for trouble-free operation and generally does not need maintenance. Maintenance
activities should only be carried out by trained personnel.
Periodic inspection of the repeater equipment(s) is recommended, the recommended tasks includes:
Verify the direction and position of antennas. Re-align if necessary.
Make sure the cable connector and sealing on the RF cable connectors are not damaged.
Verify lightning and grounding protection is in good condition.
End of Section