background image

USER MANUAL FOR MBDA-200S

 

 

ENU STATUS : 1-0-0 

Copyright - refer to title page 

Page 20 

 

 

 

 

3.3.4  mBDA IN NORMAL EQUIPMENT CABINET 

mBDA  is  an  indoor  type  device.  It  can  be  installed  in  normal  equipment  cabinet,  the  installation 
procedures are shown as below: 
 
Step  1:  Make  sure  the  equipment  cabinet  is  available  with  pallet,  and  the  pallet  is  fixed  steadily 
(Equipment  Cabinet  nuts,  screws  and  pallet  are  not  provided.).  Use  cabinet  nuts,  screws  and  pallet  as 
recommended by rack manufacturer. 

                                         

 

Figure 10: Equipment Cabinet with Pallet  

 
Step 2:  Install the mBDA on to the pallet. 

Содержание mBDA

Страница 1: ...B BA AN ND D S SE EL LE EC CT TI IV VE E W WI IR RE EL LE ES SS S R RE EP PE EA AT TE ER R USER MANUAL MBDA 200S QE 1 0 0 Comba Telecom Ltd mBDA 200S...

Страница 2: ...Comba International Comba All rights reserved The information contained herein is confidential and the property of Comba and is supplied without liability for errors or omissions No part may be repro...

Страница 3: ...AYOUT 12 2 3 EQUIPMENT CONSTITUTION 13 2 4 KIT OF PART 13 3 INSTALLATION 14 3 1 WARNINGS AND ALERTS 14 3 2 SITE PLANNING CONSIDERATIONS 15 3 3 INSTALLATION PROCEDURES 16 3 4 EQUIPMENT CONNECTORS 26 3...

Страница 4: ...ER MANUAL FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 4 7 APPENDICES 50 7 1 APPENDIX A TOOLS FOR INSTALLATION AND MAINTENANCE 50 7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION...

Страница 5: ...ommissiong Flow Chart 30 Figure 25 Input IP Address 32 Figure 26 Input Domain Name 32 Figure 27 Input User Name and Password 32 Figure 28 Web GUI Main Screen 33 Figure 29 Devices Sceen 33 Figure 30 Po...

Страница 6: ...Setting 46 Figure 56 Commissioning Procedure DL Output Power Setting Screen 47 Figure 57 Commissioning Procedure DL Output Power Setting 47 Figure 58 DL Output Power Over Exceed 48 Figure 59 Commissio...

Страница 7: ...USER MANUAL FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 7 0 3 HISTORY Change No ENU Details Of Change 1 1 0 0 This user manual first created in Aug 2014...

Страница 8: ...oise Amplifier MCU Main Control Unit MT Mobile Terminal MTBF Mean Time Between Failures MBDA Master Unit NC Normally Closed NF Noise Figure NO Normally Open OMC Operation Maintenance Center OMT Operat...

Страница 9: ...party responsible for compliance Such modifications could void the user s authority to operate the equipment This device complies with Part 22 and 24 of the FCC Rules Operation is subject to the follo...

Страница 10: ...requirements of the network Remote configuration and surveillance is possible through Comba s remote control and monitoring system via PC or Ethernet to the OMC Main feature mBDA 200S is a high qualit...

Страница 11: ...peater After the duplexer the signals are sent to the LNA module for pre amplification and digital RF integrated module for digital filtering and frequency conversion Then the DL signals will be sent...

Страница 12: ...USER MANUAL FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 12 2 2 EQUIPMENT LAYOUT 58 6 81 4 482 58 6 26 1 436 485 6 439 265 2 Figure 3 Layout of mBDA...

Страница 13: ...mbiner Units first slot is for Power Monitoring Unit mBDA PMU Power Monitoring Unit PMU converts the input voltage into stable DC to supply power for each RF module and provides monitor control mBDA R...

Страница 14: ...ems involving adverse weather extreme temperatures wet corrosive or dirty conditions flammable or explosive atmospheres the system must be suitably installed to prevent danger Protective Earthing For...

Страница 15: ...d unrestricted air flow The installation location for the system should be well ventilated The equipment has been designed to operate at the temperature range and humidity level as stated in the produ...

Страница 16: ...mizing the length and number of RF connections Ensure the equipment will be operated within the stated environment refer to datasheet Where appropriate confirm available of suitably terminated grade o...

Страница 17: ...d separately Follow the steps below to assemble Figure 4 mBDA Screen Step1 The rack with cover plates is shown as Figure 5 Please remove the cover plates before installing related modules Show as Figu...

Страница 18: ...U STATUS 1 0 0 Copyright refer to title page Page 18 Figure 6 Remove Cover Plates Step 2 PMU installation Insert PMU and fasten the screws Figure 7 PMU Installation Step 3 RF Units installation Insert...

Страница 19: ...USER MANUAL FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 19 Figure 8 RF Unit Installation Step 4 Finish Installation Figure 9 mBDA Installation Finish...

Страница 20: ...mal equipment cabinet the installation procedures are shown as below Step 1 Make sure the equipment cabinet is available with pallet and the pallet is fixed steadily Equipment Cabinet nuts screws and...

Страница 21: ...DA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 21 Figure 11 mBDA Installation Step 3 Attach the mBDA onto the cabinet with the recommended rack screws Figure 12 Secure the Screws Step 4 F...

Страница 22: ...TING mBDA can also be installed in 19 rack mounting the installation procedures are shown as below Step 1 Install right angle bracket and left angle bracket on back of the mounting rack 19 Rack nuts s...

Страница 23: ...1 0 0 Copyright refer to title page Page 23 Figure 14 Mounting Rack Figure 15 Angle Iron Installation Step2 Slide the mBDA on to the angle brackets and confirm it is level The left and right angle br...

Страница 24: ...DA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 24 Figure 16 mBDA Installation Step 3 Attach the mBDA onto the rack with the recommended rack screws Figure 17 Secure the Enclosure Step 4 F...

Страница 25: ...USER MANUAL FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 25 Figure 18 Finish Installaiton...

Страница 26: ...ENU STATUS 1 0 0 Copyright refer to title page Page 26 3 4 EQUIPMENT CONNECTORS The figure below presents the connectors of mBDA Figure 19 mBDA Front Panel Connectors Figure 20 mBDA Rear Panel Connec...

Страница 27: ...CPL Output coupler port 40dB QMA female 6 MT RF output port Mini Din female 7 Grounding connector 8 FAN Fan inside 9 POWER Power switch 10 AC100 240V AC power supply connector 3 5 EQUIPMENT CONNECTION...

Страница 28: ...cation and definition Pin numbering are shown looking into the connector on the enclosure 1 2 3 4 Figure 23 Pins Allocation for EXT_ALM Port for mBDA Table 4 Pin Definition of EXT_ALM Port for mBDA Pi...

Страница 29: ...ounding wires and RF cables Check grounding connection and verify that the ground resistance is less than 5 Connect the equipment to the PC Power on equipment Monitor the initialization of the equipme...

Страница 30: ...dure is shown below Connect and inquiry status Set channel No Input power detection and adjust the direction of Donor Antenna Output power confirmation Drive test and adjust the direction of Service A...

Страница 31: ...Monitoring Parameters Select the equipment controlled and monitored parameters If the external devices are connected to the equipment for management please enable in the External Alarm Info Interface...

Страница 32: ...e to set up a physical connection Step 2 Open browser browser IE7 0 IE8 0 Chrome or Firefox suggest disply resolution is 1024 768 input Web GUI IP address 192 168 8 101 click Enter Figure 25 Input IP...

Страница 33: ...log in the Web GUI main screen will appear We take dual bands products for example Figure 28 Web GUI Main Screen On Comba Web GUI Home Screen there are four Menu bars Devices Commissioning Firmware a...

Страница 34: ...USER MANUAL FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 34 PMU Main Management Screen Figure 30 Power Monitoring Unit RF Unit Management Screen Figure 31 RF Unit...

Страница 35: ...put power or reflected power is still over the threshold PA Service Status will turn to Recovery again If PA output power or reflected power is still over the threshold after six times of PA Recovery...

Страница 36: ...ious one Follow steps shown in below figure to upgrade firmware Figure 34 Firmware Screen Upgrade Step 4 After clicking a window will pop up and click Figure 35 Firmware Screen Pop up Window 1 Step 5...

Страница 37: ...e Page 37 Figure 36 Firmware Screen Swap 5 2 4 MANAGEMENT Other parameters can be configured on Management Screen Figure 37 Management Sceen There are nine function bars list in the left side of the M...

Страница 38: ...below sub band alarm enable ATT value RF switch DL output power and so on Import and Export can help users quickly configure mBDA parameters For example if one mBDA finished configuration users can e...

Страница 39: ...be set correctly according to the location IP of remote connection If more than one equipment is connected to the public network through the same router the router s local IP CANNOT be set as 192 168...

Страница 40: ...re 42 Modify Password Note Username cannot be modified Device Reset Figure 43 Management Device Reset Note If users click all the parameter and alarm will set to factory default value Device Reset pro...

Страница 41: ...t Figure 44 Management PA Reset Note PA will be turned off by software when PA output power or VSWR reflected power is exceed the threshold Users need to reset PA after debugging Device Info Figure 45...

Страница 42: ...lation Note This Step is the same as step3 of Commissioning Users can check isolation again by clicking Check button Report Figure 47 Management Report Note Click Create to create report The report ca...

Страница 43: ...G PROCEDURE To complete the installation and commissioning users need to follow the steps below Step 1 Click Menu bar Commissioning on home screen a work flow will show up Figure 48 Commissioning Proc...

Страница 44: ...service antennas before proceeding to step 4 Step 4 Click to enter to Isolation Detection Screen shown as Figure 52 Select a frequency band RFU that need to commission Click to start Isolation Detecti...

Страница 45: ...STATUS 1 0 0 Copyright refer to title page Page 45 Figure 51 Commissioning Procedure Isolation Detective Figure 52 Commissioning Procedure Isolation Detective Confirm Figure 53 Commissioning Procedur...

Страница 46: ...0 Copyright refer to title page Page 46 Figure 54 Commissioning Procedure Isolation Detection Finish Step 5 RF Setting Screen for setting subband bandwidths and switchs Figure 55 Commissioning Proced...

Страница 47: ...L output power setting after finishing subband bandwidths and switchs setting Figure 56 Commissioning Procedure DL Output Power Setting Screen Figure 57 Commissioning Procedure DL Output Power Setting...

Страница 48: ...STATUS 1 0 0 Copyright refer to title page Page 48 Figure 58 DL Output Power Over Exceed Step 7 Click to commission other RFUs parameters Click to finish the commissioning Figure 59 Commissioning Pro...

Страница 49: ...ent operation status can be observed remotely through OMC Periodic inspection of the repeater equipment s is recommended the recommended tasks includes Inspect and record operation status and output p...

Страница 50: ...ENDIX A TOOLS FOR INSTALLATION AND MAINTENANCE The following tools not included in package are required for installation or routine maintenance Power Drill for wall mount Adjustable Wrench 0 31 inch 0...

Страница 51: ...FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 51 7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION End of Section End of Document FOR NAM OFFICE EMAIL PLEASE INSERT support us comba...

Страница 52: ...USER MANUAL FOR MBDA 200S ENU STATUS 1 0 0 Copyright refer to title page Page 52...

Отзывы: