6
Installation
Refer to the following diagram for proper installation:
Temp
Sense
Transformer
Shore Receptacle Control Box Output to Ships Distribution
Note: A Circuit Breaker may be required between the Shore Receptacle and
Control Box. Consults local codes and regulations.