InteliMains
NT
, SW version 3.0
InteliMains-NT-BTB-3.0-Reference Guide.pdf,
©ComAp – June 2013
190
possible
Description
This setpoint is used to adjust the relative load level (in % of total power
transferred from busL to busR -
) for load shedding. When the
power transferred through BTB exceeds this level for more than
time the next load shedding output is closed.
N
OTE
:
Learn more about load shedding in the separate chapter
Load shedding
.
12.2.12.2
Setpoint: Ld shed delay
Group
Load shedding
Range [units]
0.0 .. 600.0 [s]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used to adjust time period the percentage of the power
transferred through BTB must be above the
next load shedding output.
N
OTE
:
Learn more about load shedding in the separate chapter
Load shedding
.
12.2.12.3
Setpoint: Ld recon level
Group
Load shedding
Range [units]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used to adjust the relative load level (in % of total power
transferred from busL to busR -
) for load reconnection. When
the power transferred through BTB drops below this level for more than
time the next load can be reconnected back.
The appropriate load shedding output is either opened automatically when
the condition above is fulfiled (
activation of the input
N
OTE
:
Содержание IM-NT
Страница 86: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 86 APPENDIX...
Страница 326: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 326 17 User Notes...
Страница 327: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 327...
Страница 328: ...InteliMains NT SW version 3 0 InteliMains NT BTB 3 0 Reference Guide pdf ComAp June 2013 328...