Chapter 5: Maintenance
5-1 Preventative Maintenance Schedule
The mechanical design of the blender is very simple and very little maintenance is required.
The only moving parts are the metering gates, weigh hopper dump valve, and mixer agitator.
The checklist below contains a list of items which should be inspected and/or replaced to
keep your blender operating at peak efficiency. Perform each inspection at the regular
intervals listed below.
Figure 50: Sample Preventative Maintenance Schedule
System model #
Serial #
Daily
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect blender for
any loose parts-
tighten them
immediately.
Verify quality of
compressed air
supply.
Verify mixer door is
properly latched.
Every week
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Date/
By
Inspect metering
gates for proper
operation.
Check to make
sure that all hose
connections are air
tight.
Every month
Jan Feb Mar Apr May
Jun
Jul
Aug
Sep Oct Nov
Dec
Inspect air regulator
and air safety
circuits, if equipped.
Recalibrate blender
only If necessary.
Photocopy this page for your maintenance records
BF1-615.3
Chapter 5: 4BMaintenance
64 of 101
Содержание 882.00273.00
Страница 22: ...Figure 11 Typical Operator Screens BF1 615 3 Chapter 2 1BFunctional Description 22 of 101...
Страница 23: ...Figure 12 Typical Setup Screens BF1 615 3 Chapter 2 1BFunctional Description 23 of 101...
Страница 24: ...BF1 615 3 Chapter 2 1BFunctional Description 24 of 101...
Страница 75: ...Mixer Sub Assembly BF1 615 3 Chapter 7 6BAppendix 75 of 101...