ColleBuilt Products SD-70 Скачать руководство пользователя страница 2

 

 

INSTALLATION INSTRUCTIONS  

 
 

1.

  Locate and disconnect the vehicle battery.  

2.

  Find a suitable place to mount the electronic charging isolator, and the auxiliary 

battery. Mounting these close to the main battery is preferred because it will 
reduce the overall length of the added wiring. If you intend to mount the auxiliary 
battery inside the vehicle or in an area that is more protected than under the 
hood such as a battery box, you may want to consider placing the charging 
isolator with it for the added protection from the elements.  

Note: System components must be mounted as far or farther from the 
engine, exhaust and any other heat source or moving parts as the OEM 
fuse panel and battery that are located in the engine compartment. 

3.

  Make the necessary connections according to the included wiring schematic 

starting with the main battery. All ground connections should be made directly to 
the vehicles negative battery post on the main battery. All 12V+ connections 
should be tied directly to the vehicles positive battery post on the main battery. All 
wiring for the solenoid, and charging isolator 12V+ connections should be 
equivalent size (gauge) to the factory main battery wire or 4 gauge wire 
whichever is larger. Also, the chassis ground wire should be upgraded to match 
the main power wire size if it isn’t already matched. The 120A circuit breakers 
should be wired within 18” of their respective positive battery posts.  

4.

  The ground supply wire for the charging isolator and solenoid should be 16g.  

5.

  The manual activation switch also has a built in indicator led that will be 

illuminated if the system is active. It should be mounted in a location that is both 
highly visible to the driver and easy for them to reach and activate while driving 
the vehicle. All wiring for the override switch and the visual alarm should be 16g.   

 

 

 

 

 

 

 

 

 

 

 

 

 

WIRING SCHEMATICS ON FOLLOWING PAGE 

 

  

 

Содержание SD-70

Страница 1: ...rovided with the products and install them following all guidelines Follow the maintenance guidelines as instructed in the installation instructions as well as this notification form If a back up system is not properly installed into the modified vehicle and maintenance guidelines are not met it could result in serious injury and or death INSTALLATION GUIDELINES 1 Failure to follow these guideline...

Страница 2: ...battery All ground connections should be made directly to the vehicles negative battery post on the main battery All 12V connections should be tied directly to the vehicles positive battery post on the main battery All wiring for the solenoid and charging isolator 12V connections should be equivalent size gauge to the factory main battery wire or 4 gauge wire whichever is larger Also the chassis g...

Страница 3: ...ive battery post on auxiliary battery 16G Out to empty small terminal on solenoid opposite of the ground connection Blue Red Brown Orange 16G Chassis Ground Switch Wiring Solenoid 16G ground wire 4G Wire Minimum 4G Wire Minimum 4G Wire Minimum 4G Wire Minimum 5A Fuse within 18 Of Battery ...

Страница 4: ...and it is now time to check override switch function 4 Allow any surface charge to dissipate and using a voltmeter measure the voltage of each battery and record the results 5 With the key in the off position turn on the vehicles lights manually and using a volt meter monitor the main battery s voltage It should drop steadily as the load from the light circuit slowly drains power from the main bat...

Отзывы: