CHASE INSTALLATIONS 
 

Instructions for chase installations are included with the chase 
style termination chosen.  In a multiple chase installation, be 
sure to provide adequate distance between terminations to 
prevent smoke spillage from one termination to another.  We 
suggest that terminations be separated at least 24 inches, 
center to center and stacked at vertical height difference of 18 
inches (see figure 18). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

10-FOOT RULE 
 

All flue gas outlet of chimney termination must extend a 
minimum of 3 feet in height above the highest point where it 
passes through the roof and must be at least 2 feet above the 
highest point of the roof that is within a horizontal distance of 
10 feet (see figure 19). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FINISHING THE FIREPLACE 
 

Combustible materials, such as wallboard, gypsum board, 
sheet rock, drywall, plywood, etc. may make direct contact 
with sides and top periphery of the fireplace face. It is 
important that combustible materials do not overlap the face 
itself.  Brick, glass, tile or other non-combustible materials 
may overlap the front face provided they do not obstruct 
essential openings like louvered slots or any other opening.  
When overlapping with a non-combustible facing material, 
use only non-combustible mortar or adhesive. 
 

MANTEL 
 

A mantel may be installed if desired (see figure 20), 
Woodwork such as wood trims, mantels, or any other 
combustible material projecting from the front face must not 
be placed within 9 inches of the fireplace opening (and within 
6 inches of the top louver opening).  Combustible materials 
above 9 inches and projecting more than 1-1/2 inches from the 
fireplace must not be placed less than 12 inches from the top 
opening of the fireplace (NFPA STD 211, Sec. 7-3.3.3). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

NOTE: HUD requirements may supersede these minimum 

dimensions. 

 
 

OPERATING GUIDELINES AND MAINTENANCE 

INSTRUCTIONS 

 

GLASS DOORS 
 

Glass doors are standard with the C42MW fireplace.  When 
the fireplace is in operation, doors must in FULLY OPENED 
or FULLY CLOSED position only or a fire hazard may be 
created (see figure 21). 
A fireplace equipped with glass doors operates much 
differently than a fireplace with an open front.  A fireplace 
with glass doors has a limited amount of air for combustion.  
Excessive heat within the fireplace can result if too large a fire 
is built or if the combustion air gate is not completely open.  
The following tips should be followed to assure that both the 
fireplace and the glass door retain their beauty and function 
properly.  Both the flue damper and the glass doors must be 
fully opened before starting the fire.  This will provide 
sufficient combustion air and maintain safe temperatures in 
the firebox. 
 

Figure 18      MULTIPLE CHASE INSTALLATION 

Figure 19                 10-FOOT RULE 

 

Figure 20          MANTEL CLEARANCE 

Содержание C42MW

Страница 1: ...pproved to ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard A DESA hood must be installed when using a vent free gas log heater see...

Страница 2: ...T INSTALLATION PG 4 7 FAN KIT ASSEMBLY PG 4 8 CHIMNEY PIPE PG 4 5 9 FIRESTOP THIMBLE AND SPACERS PG 5 6 10 FLASHING AND TERMINATION PG 7 11 FINISHING YOUR FIREPLACE PG 8 12 MANTEL PG 8 13 GLASS DOORS...

Страница 3: ...rs 0 minimum Mantel Clearances see page 8 Mantels Chimney Outer Pipe Surfaces 2 minimum MINIMUM MAXIMUM CHIMNEY HEIGHT The minimum height of the chimney measured from the base of the fireplace to the...

Страница 4: ...rotector should be made of galvanized sheet metal 28 gage minimum to prevent corrosion STEP 6 Secure the fireplace to the floor using tie down straps see figure 3 to prevent shifting HEARTH EXTENSION...

Страница 5: ...lide power source wiring through the strain relief opening and electrical cover plate and make all the necessary connections iv Slide all wiring connections in the electrical housing as shown in figur...

Страница 6: ...c space of a manufactured home To install the thimble assembly determine the distance between the ceiling joist and the roof framing Attach the adjustable thimble to the firestop spacer so that the as...

Страница 7: ...figure 13 PENETRATING THE ROOF To maintain a 2 inch clearance to the pipe on a roof with a pitch a rectangular opening must be cut STEP 1 Determine the center point through which the pipe will penetra...

Страница 8: ...ly waterproof caulk around the perimeter of the collar to provide a proper seal Note Storm collar is required but can be installed after the home is sited TERMINATIONS SPARK ARRESTOR The fireplace sys...

Страница 9: ...L A mantel may be installed if desired see figure 20 Woodwork such as wood trims mantels or any other combustible material projecting from the front face must not be placed within 9 inches of the fire...

Страница 10: ...out indentation must be firmly tapped with any solid object until it is released Remove fragmented portions of refractory see figure 22 STEP 2 Remove gas line cover plate on either side of fireplace a...

Страница 11: ...ch in and push the handle back into the keyhole slot then pull down and forward to lock it in place see figure 25 FOR FURTHER OPERATING GUIDELINES INSTRUCTIONS AND WARRANTY INFORMATION PLEASE REFER TO...

Страница 12: ...11 For more information visit www desatech com ILLUSTRATED PARTS...

Страница 13: ...GM 2 14 106967 01 WELDMENT SIDE DAMPER 1 45 11165 SCREW 18 x 5 8 MD TR BLACK OX 8 15 108298 03 WELDMENT FRONT FACE 1 46 11301 RIVET POP SD42BS STEEL 11 16 108302 01 DEFLECTOR AIR 1 47 11308 RIVET ALUM...

Страница 14: ...24 8DM 24 Double Wall Pipe 1 0 18 8DM 18 Double Wall Pipe 0 2 FST A Adjustable Firestop Thimble 1 1 V6F 8DM Roof Flashing 1 1 VSC1 8DM Storm Collar 1 1 RTL 8DM Round Cap Termination 1 1 VENT KITS USE...

Страница 15: ...24 8DM 36 8DM DOUBLE WALL PIPE 36 SECTION 9736A1236 36 8DM 48 8DM DOUBLE WALL PIPE 48 SECTION 9736A1248 48 8DM V6F 8DM ROOF FLASHING 0 6 12 PITCH 9736 5241 V6F 8DM V12F 8DM ROOF FLASHING 6 12 12 12 P...

Отзывы: