14
Part X – Maintenance and
Troubleshooting
Your Coldelite dispenser has been designed,
engineered, and manufactured to achieve high
performance and long durability. The life
expectancy of any machine depends not only on
the quality of engineering, and components used,
but also on the basic maintenance procedures.
It is important for you to become familiar with a
few of the basic operating procedures.
·
Only remove orings with the oring extractor
provided in the machine spare parts kit.
·
Clean and sanitize the freezer in accordance
with the instructions in this operation manual.
·
Lubricate all orings and seals as instructed.
·
The wearing or the improper cleaning of the
Mix Pump Shaft seals will result in product
leakage into the rear of the machine. Check
frequently and replace seals when necessary.
·
Replace any oring that is leaking or damaged.
·
When all of the spare parts supplied in the spare
parts kit are used, re-order immediately. Do not
wait until the part is urgently needed or causes
the machine to be inoperative without it.
·
During the washing, cleaning and sanitizing
procedures, operate the machine in the “Power
ON” mode as little as possible. This will
minimize component wear on the dispenser.
·
When removing and installing the dispenser
parts, handle these with care. DO NOT drop or
bang together as this will damage the parts and
affect the dispensers performance.
·
NEVER use HOT WATER when washing,
cleaning, or sanitizing your freezer or its parts.
ALWAYS use luke warm water (80-90F).
!! IMPORTANT !!
Your machine is Air Cooled, and its efficiency
depends on a clean air-cooled condenser. The fins
of the condenser must be straight and cleaned a
minimum of every one or two months. Prior to
cleaning the air condenser, place the machine in
the OFF mode and disconnect power to the
dispenser.
The following is a recommended wearable parts
replacement schedule. This is for normal
operation of the freezer and will vary based on
the volume and type of product served as well as
operational and cleaning procedures.
Replacement Schedule
Orings and Seals – Every 6 months or as needed
Drive Belt – Every 2 years or as needed
Mix Pump Gears – Every 3 years or as needed
Pump Drive Bearings – As needed
Plastic Parts - As need when leaking, scratched,
or broken
Rebuild Mix Pumps – Every 5 years or as needed
Electrical Components – When malfunctioning.
!! IMPORTANT !!
Prior to opening any of the machines outer
panels, place both sides in the STOP / OFF
mode and disconnect the machines power
supply. Failure to do so can result in serious
injury and or death.