![Cold Jet Aero V Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/cold-jet/aero-v/aero-v_operators-manual_2635126016.webp)
AERO V OPERATOR MANUAL
12
MAINTENANCE
DAILY MAINTENANCE
Drain water out of the lines before using the Aero V by turning the bleed valve to the ON
(I) position.
While the Aero V is in operation, check the pressure gauge for damage.
Inspect the air and blast hoses for damage like cuts or kinks.
o
If blast hose inflates during operation, or hose leak is otherwise detected, hose is
damaged and must not be used.
WEEKLY MAINTENANCE
Inspect the feeder rotor for wear and damage.
Ensure the nozzle airflow exit end is not deformed or burred.
MONTHLY MAINTENANCE
Check the air filter element and replace if needed using Cold Jet part number 4I0308.
BIANNUAL MAINTENANCE
Inspect pneumatic air lines for damage.
Inspect the power cord for damage.
Inspect all lights.
Inspect the static bonding cable for damage.
Inspect all the accessories for damage.
Inspect all valves.
Содержание Aero V
Страница 1: ...Aero V OPERATOR MANUAL Original Instructions...
Страница 4: ......
Страница 20: ......
Страница 28: ......
Страница 30: ...AERO V OPERATOR MANUAL P R Red circle with S Specifi T U W Weekly Maintenance Y...
Страница 31: ...TRAINING VIDEO...
Страница 32: ...AERO V OPERATOR MANUAL 05 15 2013...