background image

13

OM.A40FP.20150701

UNIT OPERATION

IN THIS SECTION 

Start Up. . . . . . . . . . . . . . . . . . . . . . . . . . 13

Blast Cleaning Technique. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 

Re-loading Dry Ice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Shut Down . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

START UP

 

Read all safety instructions before operation and follow them closely (p. 2-4).

 

Always wear proper personal protective equipment including eye protection to guard against    

ȵ\LQJREMHFWVHDUSURWHFWLRQWRSUHYHQWKHDULQJORVVDQGJORYHVWRSURWHFWKDQGVIURPH[SRVXUH

 

to cryogenic temperatures.

 

Before loading dry ice, purge with compressed air to be sure the system is clear of excess  

 

                 moisture and debris.

To start the Aero 40FP:

1. 

0DNHVXUHWKH3RZHU6ZLWFKLVR΍DQGWKHEOHHGYDOYHLVFORVHG

2. 

Attach the blast hose and control cable to the machine.

3. 

Attach the applicator to the blast hose and control cable.

4. 

Attach a nozzle to the applicator.

5. 

Attach the whip check to the air supply hose, then attach the air supply hose to the 
machine. (Check the data plate for the operating pressure range.)

6. 

Connect the static bond cable to the connector on the hose and then to the target surface.

7. 

Turn air supply on and allow the air hose to pressurize.

8. 

Plug the power cord into an electrical outlet. If an extension cord is necessary, it must 
comply with the power requirements of this unit and all governing electrical codes. (Check 
the data plate for the operating voltage range.)

9. 

Turn the Control Panel Power Switch on and ensure the Disable Blast button is 

GLVHQJDJHGEOXHOLJKWLVR΍

Содержание Aero 40FP

Страница 1: ...Guide 6SHFL FDWLRQV Components 12 Unit Operation Start Up Blast Cleaning Technique Shut Down 16 Maintenance Symbol Glossary Maintenance Troubleshooting Contacting Cold Jet Warranty 24 Appendix A Blast...

Страница 2: ...t is error free No part of this publication may be reproduced stored in a retrieval system or transmitted in any form or by any means electronic mechanical photocopying recording or otherwise without...

Страница 3: ...2006 42 EC Machinery Directive Directive 2004 108 EC EMC Directive References to the harmonized standards used Person in the European Community authorized to compile the technical documentation Cold J...

Страница 4: ...use in the food industry allows most items to be cleaned in place without time consuming disassembly FDQ EH XVHG ZLWKRXW GDPDJLQJ DFWLYH HOHFWULFDO RU PHFKDQLFDO SDUWV RU FUHDWLQJ UH KD DUGV can be us...

Страница 5: ...1 OM A40FP 20150701 SAFETY GUIDELINES Aero 40FP...

Страница 6: ...Never point the nozzle at self or anyone else and always exercise extreme caution when people are in the blast area x Never use a wire tie to hold the applicator trigger in the on position This will...

Страница 7: ...O2 varies with the amount of dry ice and humidity present Ground the Material Being Cleaned Always ground the material being cleaned to assure safe operation while blasting 1 Know your environment x E...

Страница 8: ...nvironment rapidly x Only operate the 40FP with a proper ventilation system that maintains the concentration levels of the governing codes of your local national body x Always review and observe all s...

Страница 9: ...5 OM A40FP 20150701 COMPONENT GUIDE Aero 40FP...

Страница 10: ...Dry Ice Capacity Dry Ice Capacity 40 lb 18 2 kg 40 lb 18 2 kg Variable Feed Rate Variable Feed Rate 0 4 5 lbs min 0 2 kg min 0 4 5 lbs min 0 2 kg min Power Requirements Power Requirements 100 140 volt...

Страница 11: ...7 OM A40FP 20150701 AERO 40FP FRONT 1 Fill lid 3 Air supply connection 2 Bleed valve...

Страница 12: ...8 OM A40FP 20150701 AERO 40FP BACK 1 Blast pressure control 3 AC power cord 2 Nozzle hanger 4 Blast hose connection...

Страница 13: ...9 OM A40FP 20150701 CONTROL PANEL 1 Power switch 4 Feed rate control 2 Blast power indicator 5 Incoming blast air pressure 3 Disable blast blue light disabled 6 Hour meter...

Страница 14: ...E APPLICATOR 1 Machine power indicator 6 Electric cable connection 2 LU RQO R DLU LFH 7 Blast hose connector 3 Light switch 8 Front rear concurrent hand trigger 4 Blast lights 9 7KUHDGHG PRXQW KRRN KD...

Страница 15: ...20150701 HEAVY DUTY APPLICATOR 1 LED light switch optional 5 Nozzle retention collar 2 Applicator safety switch 6 Blast hose connector 3 Air ice control 7 Trigger 4 Electric cable connection 8 LED lig...

Страница 16: ...12 OM A40FP 20150701 UNIT OPERATION Aero 40FP...

Страница 17: ...G YDOYH LV FORVHG 2 Attach the blast hose and control cable to the machine 3 Attach the applicator to the blast hose and control cable 4 Attach a nozzle to the applicator 5 Attach the whip check to th...

Страница 18: ...before loading dry ice Following the proper start up procedure will remove any water ice and moisture build up in the system 2 Position the blast hose for maximum maneuverability before blasting 3 Do...

Страница 19: ...sh in the Disable Blast Button on the Control Panel 2 Remove unused ice from the hopper 3 Pull out the Disable Blast Button on the Control Panel 4 Flip the Air Ice Control Switch on the Applicator to...

Страница 20: ...16 OM A40FP 20150701 MAINTENANCE Aero 40FP...

Страница 21: ...phical symbol indicates what the hazard is 2 A blue mandatory action circle white graphical symbol indicates an action to take to avoid the hazard 3 A red prohibited action circle with slash black gra...

Страница 22: ...ut in De Energized State WARNING SYMBOL Static Shock MANDATORY ACTION Maintain Safe Pressure WARNING SYMBOL Hand Entaglement Chain Drive MANDATORY ACTION Wear Ear Protection WARNING SYMBOL Low Tempera...

Страница 23: ...19 OM A40FP 20150701 MAINTENANCE DAILY DAILY WEEKLY WEEKLY MONTHLY MONTHLY BIANNUAL BIANNUAL...

Страница 24: ...a act ct ct ct ct ct c ct ct ct ct ct ct ct t ct t ct ct ct ct ct ct ct t ct o o o o o o o o o o o o o o o o o o o o o o o ou ur u u ur ur ur ur ur ur r r ur u ur r ur ur ur ur ur ur ur u u C C C C C...

Страница 25: ...e Inside the US 1 800 777 9101 Outside the US 1 513 576 8981 FAX 1 513 831 3672 Phone 1 800 337 9423 Ext 501 FAX 1 513 831 1209 After Hours Technical Support 1 800 777 9101 Phone 52 81 1097 0445 After...

Страница 26: ...J may replace the Equipment in its entirety at its discretion Any claim must be made in writing to CJ within 30 days after the defect is discovered and any claim not made within that period shall be d...

Страница 27: ...23 OM A40FP 20150701 APPENDIX Aero 40FP...

Страница 28: ...watch the pressure gauge while blasting I WKH JDXJH GURSV VORZO WKH FRPSUHVVRU LV LQVX FLHQW If the gauge drops quickly there is a restriction or the pipe is too small If the gauge stays steady then...

Страница 29: ...d damage the target surface If blasting continuously use an air dryer to further reduce the air moisture dew point Desiccant dryers produce a dew point of 40 F 40 C resulting in a dew point low enough...

Страница 30: ...r eyes quickly causes tissue damage Always protect skin from direct contact with CO2 pellets nuggets or slices 2 Noise Emissions When the proper safety precautions are not followed prolonged exposure...

Страница 31: ...27 OM A40FP 20150701 APPENDIX C SCHEMATICS IN THIS SECTION 120 VAC Schematic and BOM 28 230 VAC Schematic and BOM 34 Pneumatic Schematic 40...

Страница 32: ...28 OM A40FP 20150701...

Страница 33: ...29 OM A40FP 20150701...

Страница 34: ...30 OM A40FP 20150701...

Страница 35: ...31 OM A40FP 20150701...

Страница 36: ...32 OM A40FP 20150701...

Страница 37: ...33 OM A40FP 20150701...

Страница 38: ...34 OM A40FP 20150701...

Страница 39: ...35 OM A40FP 20150701...

Страница 40: ...36 OM A40FP 20150701...

Страница 41: ...37 OM A40FP 20150701...

Страница 42: ...38 OM A40FP 20150701...

Страница 43: ...39 OM A40FP 20150701...

Страница 44: ...40 OM A40FP 20150701...

Страница 45: ...41 OM A40FP 20150701...

Страница 46: ...ing Cold Jet 21 Control Panel 9 M Maintenance 19 O Operation Blast Cleaning Technique 14 Loading Dry Ice 15 Shut Down 15 Start Up 13 R Residual Risks 26 S Safety General Requirements 2 Electrostatic D...

Страница 47: ...43 OM A40FP 20150701 TRAINING DVD...

Страница 48: ......

Отзывы: