![Coffee Queen TOWER Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/coffee-queen/tower/tower_service-manual_2634497033.webp)
33.
11. Programming. Hardware test - SERVICE
TOWER
Hardware test:
Controll of hardware.
1.
Checking all electrical outlets:
(No outgoing
voltage from the electronic-card in 3 seconds).
2.
Control of water, in 3 seconds.
3.
Control left outlet valve, in 3 seconds.
4.
Control right outlet valve, in 3 seconds.
5.
Control heating element, in 3 seconds.
6.
Testing buzzer, in 3 seconds.
7.
Testing temperature in tank, in 3 seconds.
8.
Control of membrane switch
by pushing the
buttons 1, 2, 3, 4, 5, 6.
See fig.
9.
Display shows:
Function of temp. sensor. = L1/L2.
10.
To leave programming: Restart machine.
1.
To do a hardware test, restart machine.
Machine must be in position OFF.
Push buttons 1, 3 left side at the same time
and start machine, position ON.
ON/
OFF
ON
1
4
2
5
3
6
1
4
2
5
3
6
Содержание TOWER
Страница 20: ...20 40 41 42 50 49 48 43 44 45 46 47 51 52 14 Sprängskiss Serveringsstation TOWER 53 ...
Страница 38: ...14 Exploded View serving station TOWER 38 40 41 42 50 49 48 43 44 45 46 47 51 52 53 ...
Страница 39: ...39 15 Elschema Electrical diagram 3 x 400VAC ground zero TOWER ...
Страница 40: ...40 15 Elschema Electrical diagram 3 x 400VAC ground TOWER ...
Страница 41: ...41 15 Elschema Electrical diagram 3 x 230V ground TOWER ...
Страница 42: ...42 16 Måttskiss Dimension sketch Tower station TOWER ...
Страница 43: ...43 16 Måttskiss Dimension sketch serving station TOWER ...
Страница 44: ...44 17 Väggmontering bryggstation Wall mounting brew station TOWER ...