![CODEL TunnelTech 100 Series Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/codel/tunneltech-100-series/tunneltech-100-series_technical-manual_2633996015.webp)
Technical Manual
Page
7
CODEL
Issue : A
Rev. :
Date : 29/06/2015
Ref. : 100190
4. Installation
Be sure to observe all necessary safety precautions at all times during installation.
All cable gland entry holes are drilled and tapped M20 x 1.5 and are fitted with blanking plugs.
Cable glands are to be supplied by the customer according to the cables used during
installation.
4.1. Mounting Details
After unpacking the equipment check, using the packing list provided, that all items are present. The
TunnelTech 101 Air Quality Monitor (AQM) is carried on a pair of fabricated mounting brackets (if supplied).
4.1.1. TunnelTech 101 (AQM)
The AQM comprises a transmitter and receiver unit. Secure the AQM to the tunnel wall by the mounting-
brackets supplied using 4 x M8 bolts (by others) such that the transmitter and receiver are 6m apart. The
transmitter and receiver should be mounted horizontally and arranged as illustrated in Figure 2.
Figure 2: TunnelTech AQM
– Mounting holes
Site tube
Receiver
Transmitter
Wall mounting holes
4 x
ǿ 9mm holes at 90° as shown on ǿ 80
PCD.
6m
Rx/Tx Cable
Site tubes are supplied and should
be bolted onto the mounting
brackets using the 3 x M6 bolts
provided.
Содержание TunnelTech 100 Series
Страница 3: ...Technical Manual CODEL Issue A Rev Date 29 06 2015 Ref 100190...
Страница 6: ......
Страница 8: ......