Installation of the ADU
3-20
Chapter 3: Installation
98-150471-A02
diameter. See also
N-connector interface on the ADU
on page A-7 for a more detailed
drawing how to connect the N-connector on the ADU.
Ensure that the connector assembly is properly protected against seawater and
corrosion. As a minimum, wrap it with self-amalgamating rubber.
9. Put the protection plate in place and fasten the 4 bolts (picture 5).
10.Fasten the nut.
Where the cables are exposed to mechanical wear — on deck, through bulkheads, etc. –
protect the cables with steel pipes. Otherwise, follow standard procedures for cabling in
ship installations.
Maximum allowed RF loss in the ADU cable
Maximum allowed cable loss is
20 dB at 1700 MHz. This is to ensure optimum
performance of the system.
Figure 3-18: SAILOR 900: Connecting the ADU cable
Protection plate
N connector
1
2
3
4
5
6
SAILOR900HP.book Page 20 Monday, July 18, 2016 12:44 PM
Содержание SAILOR 900
Страница 1: ...SAILOR 900 VSAT High Power Installation manual...
Страница 141: ...Appendices SAILOR900HP book Page 1 Monday July 18 2016 12 44 PM...
Страница 142: ...SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 194: ...Linkway S2 modem C 36 Appendix C VMU settings 98 150471 A02 SAILOR900HP book Page 36 Monday July 18 2016 12 44 PM...
Страница 208: ...E 4 Appendix E DVB S satellites 98 150471 A02 SAILOR900HP book Page 4 Monday July 18 2016 12 44 PM...
Страница 232: ...CE R TTE H 2 Appendix H Approvals 98 150471 A02 SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 245: ...98 150471 A02 www cobham com satcom...