Installation of the ADU
98-150471-A02
Chapter 3: Installation
3-17
Installation
3.3
Installation of the ADU
The ADU is shipped fully assembled. You have to install it on the mast and attach the ADU
cable.
Before installing the ADU read the following guidelines.
WARNING!
Use a strong webbed sling with a belt to lift
the ADU without damaging the radome. Make sure that
the sling can carry the ADU’s weight 126,5 kg.
WARNING!
The ADU may be subject to swaying
motions in windy conditions. Always use tag lines to
stabilise the ADU during hoisting.
Figure 3-14: Use of strong sling with a belt and tag lines for safe hoisting
Webbed sling with belt
Tag lines
SAILOR900HP.book Page 17 Monday, July 18, 2016 12:44 PM
Содержание SAILOR 900
Страница 1: ...SAILOR 900 VSAT High Power Installation manual...
Страница 141: ...Appendices SAILOR900HP book Page 1 Monday July 18 2016 12 44 PM...
Страница 142: ...SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 194: ...Linkway S2 modem C 36 Appendix C VMU settings 98 150471 A02 SAILOR900HP book Page 36 Monday July 18 2016 12 44 PM...
Страница 208: ...E 4 Appendix E DVB S satellites 98 150471 A02 SAILOR900HP book Page 4 Monday July 18 2016 12 44 PM...
Страница 232: ...CE R TTE H 2 Appendix H Approvals 98 150471 A02 SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 245: ...98 150471 A02 www cobham com satcom...