background image

 

Page 8 of 10 

 

www.cobham.com/satcom

Spare Part Instruction – SAILOR 800 & 900 Pol Motor 
Document No.: 97-139037-C 
Revision: C 

 
10. Remove the four 4mm Allen screws to free the 
cable spool attached to the PMM, using the 4mm 
Allen key provided in the radome hatch. Let the cable 
spool hang freely, retain the hardware for future use. 

 

 
You can now access the polarization motor.  

 

 
11. Disconnect the power connector of the 
polarisation motor. 

 

 
12. Remove the four 4mm Allen screws that hold the 
motor, retain the hardware for future use. 

13. Remove the defective polarisation motor. 

 

 

 
14. To insert a new polarisation motor follow the 
instructions above in reverse order. 

15. Once the replacement polarization motor has 
been installed verify that the antenna passes the 
Power On Self Test (POST) as per the following 
procedure.  

 

 

 

Содержание SAILOR 800 VSAT

Страница 1: ...Reference Module ZRM reading the magnetic forces in each direction and taking a mean value as a reference position Upon initialization the encoder on the polarization unit will be calibrated based on...

Страница 2: ...of the unit by referencing the LEDs If any of the LEDs are not steady green or flashing green then further diagnostics will need to be undertaken referencing the below table If the Fail Pass LED is i...

Страница 3: ...Log into the Antenna Control Unit ACU 1 Connect a straight through Ethernet cable from the LAN port of your laptop to the LAN port of the ACU 2 Open the Network and Sharing Center on your laptop and...

Страница 4: ...CP IPv4 Option 5 The Select the Use the following IP address button and enter in an IP address of 192 168 0 2 and a Subnet Mask of 255 255 255 0 6 Now click the OK button on both the IP Protocol Versi...

Страница 5: ...Instruction SAILOR 800 900 Pol Motor Document No 97 139037 C Revision C 8 You ll now have access to the systems DASHBOARD 9 The following procedure will tell you how to access the events list and dia...

Страница 6: ...page then shows a list of active events and notifications including The time and date of the first occurrence Time UTC The event code ID The severity of the event message Severity A description descr...

Страница 7: ...the arm with the GPS antenna faces the service hatch 3 Switch off the power to the antenna using the service switch located on the rear of the pedestal 4 Rotate the antenna dish to 90 degrees of eleva...

Страница 8: ...ardware for future use You can now access the polarization motor 11 Disconnect the power connector of the polarisation motor 12 Remove the four 4mm Allen screws that hold the motor retain the hardware...

Страница 9: ...zero reference point with the antenna facing away from the service hatch 4 And finally the polarization unit then drives from end stop to end stop 270 degrees and then back to its zero reference poin...

Страница 10: ...oting Self Test You can run a self test on the ACU and ADU of the antenna system 1 From the HELPDESK page click the Self test option 2 The system will now run the Self test 3 Ensure the test is comple...

Отзывы: