71
Chapter 5
555
Install
ation che
ck
and
Installation check and test
5
This chapter provides a check list to verify that the installation was made
correctly, and shows how to make an initial test of the system.
This chapter has the following sections:
•
•
Note
The SAILOR 6110 must be registered with the Service Activation
Registration Form before you can test the system. Refer to
on page 48 for details.
Содержание SAILOR 6110 mini-C GMDSS
Страница 1: ...SAILOR 6110 mini C GMDSS Installation manual ...
Страница 2: ......
Страница 30: ...Chapter 2 Install the system 18 Install the SAILOR 3027 Vertical pole Horizontal pole ...
Страница 100: ...Chapter 6 Service and maintenance 88 Available parts ...
Страница 112: ...98 154173 A www cobham com satcom ...