![CNC QB2 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/cnc/qb2/qb2_user-manual_2627780004.webp)
Page 4
Things to check before powering on!
We’re almost there
!
It’s important to do some quick checks to ensure your machine is ready
to go. Sometimes in transport, things can wiggle loose. Here are some things to check.
❖
Check all nuts and bolts on the machine.
❖
Check the green connectors that connect all the wires. They should be firm and
secure. Try giving each wire a slight tug in each screw terminal to make sure
they are definitely secure!
PRO TIP
: You can familiarize yourself and follow the maintenance guide at the
bottom of these instructions to check that everything is nice and secure after the
machine has been moved into its home location.
❖
Download and install our CNC3D Commander software if you have a Windows
computer. It can be found here:
https://www.cnc3d.com.au/commander
Let’s plug it in!
Take the single power plug lead and plug it directly into a wall socket. It is NOT
recommended to run the machine from a power board. Once powered on, your Nighthawk
controller fan will come on and so will the display on your VFD.
You can now either choose to connect to your machine via USB on your PC or wifi via by
directly accessing the Nighthawk controllers web interface.
We highly recommend visiting the user manual for the Nighthawk controller found here:
Содержание QB2
Страница 20: ...Page 20 ...