Prepare - 24
SK350 Operator’s Manual
Gather Information
CMW
Gather Information
A successful job begins before you start working. The first step in planning is reviewing information already
available about the job and jobsite.
All Jobs
Review Job Plan
Review blueprints or other plans. Check for information about existing or planned structures, elevations, or
proposed work that may be taking place at the same time.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Ground-Penetrating Jobs
Notify One-Call Services
Call area One-Call or similar services and have existing lines located and marked. Call any utilities in your
area that do not subscribe to One-Call.
Above-Ground Jobs
Locate Overhead Lines
Note location and height of all overhead lines in jobsite and ensure that fully lifted attachment and/or load
will not touch lines.
Содержание Ditch Witch SK350
Страница 1: ...SK350 Operator s Manual Issue 3 1 Original Instruction CMW...
Страница 9: ...Contents 8 SK300 Operator s Manual CMW...
Страница 19: ...Safety 18 SK350 Operator s Manual Emergency Procedures CMW...
Страница 32: ...SK350 Operator s Manual Drive 31 CMW Drive Chapter Contents Start Engine 32 Drive 32 Shut Down 34...
Страница 49: ...Service 48 SK350 Operator s Manual Overview CMW Overview...
Страница 71: ...Specifications 70 SK350 Operator s Manual Basic Unit CMW...
Страница 74: ......
Страница 75: ......
Страница 76: ...SK350 Operator s Manual Service Record 75 CMW Service Record Service Performed Date Hours...
Страница 77: ...CMW Service Record 76 SK350 Operator s Manual Service Performed Date Hours...